Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaame_02.txt
Page: 02
Total Pages: 2

C. IF LIQUID CONTAMINATION IS DETECTED ON THE CWU-77/P,

PRELIMINARY TESTING SHOWS THE COVERALL MUST BE REPLACED WITHIN

TWO HOURS TO PREVENT OPERATIONALLY SIGNIFICANT SKIN SYMPTOMS FROM

OCCURRING.  WE DO NOT FEEL CONFIDENT THAT THIS REQUIREMENT IS

LOGISTICALLY OR OPERATIONALLY FEASIBLE AT THE PRESENT TIME.

D. THE CWU-77/P IS NOT COMPATIBLE WITH THE MULTIMAN INTERMITTENT

COOLING SYSTEM (MICS) CURRENTLY DEPLOYED AT MOST LOCATIONS.

E. WE AT CENTAF AND YOUR BASE-LEVEL DISASTER PREPAREDNESS

PERSONNEL DO NOT HAVE SUFFICIENT INFORMATION TO DEVELOP

COMPREHENSIVE TRAINING OUTLINES FOR TRAINING THE BASE POPULATION.

AVAILABILITY OF INSTRUCTORS AND FEASIBILITY OF RELEASING

PERSONNEL TO ATTEND TRAINING SESSIONS MAY ALSO PRESENT PROBLEMS.

F. AT THIS TIME THERE IS NOT A CRITICAL SHORTAGE OF GCE'S WITHIN

THE AOR.  FURTHER, PRESENT TEMPERATURE RANGES DO NOT WARRANT THE

CWU-77/P'S REPORTED THERMAL BURDEN ADVANTAGES OVERRIDING ALL

OTHER FACTORS.

3. POC'S ARE [(b) (2)], AND [(b) (2)].



[(b) (2)] 


[(b) (2)], COl, ADO              MINIMIZE CONSIDERED
                                            CWU77P

Document Page: First | Prev | Next | All | Image | This Release | Search