03    21    171549Z    AUG    90    PP    RR                                                           DE

NO

	NUMBER OF SERVICES PERSONNEL BY UTC REQUIRED [(b)(1) sec 3.4(b)(5)]

TO MATCH CURRENT POPULATION

         (3)    EQUIPMENT

	HARVEST FALCON EQUIPMENT REQUIREMENTS:  ONE HARVEST FALCON 

INDEPENDENT MUNITIONS EQUIPMENT SET

	PRESENT SHORTAGES OF HARVEST FALCON EQUIPMENT:  LISTED IN

PRIORITY ORDER:  5 CRATES OF WATER PIPE, BOX CONTAINING THE 

COUPLERS, GASKETS, ETC.  FOR THE WATER DISTRIBUTION SYSTEM, TWELVE 

100KW TACTICAL GENERATORS AS A SUBSTITUTE FOR 75O HIGH-VOLTAGE

SYSTEM, TWO 10K FUEL BLADDERS FOR 750KW, HIGH VOLTAGE CABLE WITH 

SPLICE KIT,  2-TRENCHERS, 3-BACKHOE, MOBILE AIRCRAFT ARRESTING SYSTEM,

AND 4-TACTICAL FIELD LAUNDRIES (NOTE:  DURING THE NIGHT, C-130

AIRCRAFT SHIPPED ASSETS TO AL DHAFRA.  WE HAVE NOT OBTAINED

INFORMATION FROM THE SITE AS TO WHAT ITEMS HAVE BEEN RECEIVED.)

	ENGR & SERVICES SUPPORT VEHICLES REQUIRED:  3-REFER TRUCKS

4-5TON DUMP TRUCKS, 9-EIGHT CUBIC YARD DUMP TRUCKS, 3-MANHOLE

CLEANING TRAILERS, 3-TRENCHERS, 3-IW70 FARM TRACTORS, 3-TOWED ROTARY

SWEEPERS, 3-D7 BULLDOZERS, 3-VACUUM CLEANERS, 3-SCOOP LOADER

W/BACKHOE (CASE LIKE BACKHOE), SIX 2-1/2 CUBIC YARD LOADERS,

3-SIZE 2 GRADERS, 3-VIBRATORY ROLLERS, 1500 GALLON WATER


[(b)(2)]


                                                                                                       171549ZAUG90