Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaaul_02.txt
Page: 02
Total Pages: 32

BASE: AL  AYN           POPULATION:                 AS OF DATE:    6  SEP 90     
COUNTRY U.A.E.              CURRENT:  707
                                             PROJECT:  2000     POC:  [(b)(2)]
______________________________________________________________________
                                                         SERVICES

PRIME RIBS:  LTC-HOUY                                  FEEDING STATUS:
CURRENT:  25 SCOTT                                       CONTRACT?:  Y (SEE REMARKS)
PROJECTED:  43  (18 PR SOURCED)                FALCON KITS:  (1) on hand not yet ready
PRIME FARE:  5   (4 BEALE, 1 KIRTLAND)    MKT'S:  2  (NOT FEASIBLE, TOO WINDY)
                                                                            MRE'S 2631
                                                                            B-RATS:  Y

BILLETING STATUS:                                        LAUNDRY STATUS:
CONTRACT AVAIL/USED:  0/0                        CONTRACT AVAIL/USED:  Y/Y
ON-BASE AVAIL/USED:  232/232                    FIELD AVAIL/USED:  O
TENT SPACE AVAIL/USED:  1224/1092

MORTUARY STATUS:                                       TAC FIELD EXCHANGE STATUS: 0
QTY XFER CASES:   0
QTY BAGS:  0
_____________________________________________________________________________
                                                           ENGINEERING 

PRIME BEEF:  LTC - LEGRAND                        WATER STATUS:  LOCAL
CURRENT  100                                                    QTY/DAY LOCAL:  WATER MUST BE
                                                                                                                TRUCKED IN
                                                                                                                LTD AMOUNT
PROJECTED:  100                                                 DIST SYS STATUS:  NONE 
                                                                               TREATMENT STATUS:  NONE (PLANT UNDER
                                                                                                                         CONTRUCTION)
SANITARY STATUS:                                           ROWPU STATUS:  0/need to source three asap/13 
Sept 90
LOCAL SYS:  Y (SEE REMARKS)                      ERD STATUS:  0
FIELD SYS:  Y  (SEE REMARKS) 2 on hand      STORAGE CAPACITY:  AVAIL/UG STORAGE
                                                                                                                      BUT QTY 10000 GAL

SHOWER/SHAVE STATUS:                                POWER STATUS:
LOCAL SYS AVAIL/QTY:Y(SEE REMARKS)   COMMERCIAL AVAIL/CAP:  11KVA AVAIL
                                                                              AT SUBSTATION (.5KM FROM R/W)
FIELD SYS AVAIL/QTY:  4  (1 FALCON)          FIELD AVAIL/CAP:NONE
                                                                              DISTRIBUTION SYS CAP:    NONE
                                                                    	          GENERATOR QTY/CAP: 4-750KW/2-100KW/5-600KW/2-300KW

ATH HOSP STATUS:  1 ATC IN OPERATION, ANOTHER LATER
WASTE MGMT SYS:  L LOCAL HOST NATION   VEHICLE STATUS:  NONE

AIRFIELD STATUS:                                               RRR CAPABILITY:  NONE
PAVE COND/CAP:  EXCC/LCN 100 ON R/W.,  T/W, APRON
BARRIER:  NONE
NAV AIDS:  TACAN

FIRE FIGHTERS:  MSGT JACKSON                                  EQUIPMENT/SUPPLIES:
CURRENT:  34 (19 LITTLE ROCK (FROM BATEEEN)    VEHICLES:  3 P19 1P13
                          24 SCOTT)
PROJECTED:  34 (FROM SCOTT FIRE)                            AFFFF: 2650
                                                                                             AIR:  10 SCBA

IMEACS:  this is a bare base          

Document Page: First | Prev | Next | All | Image | This Release | Search