Document Page: First | Prev | Next | All | Image | This Release | Search

File: aabbc_02.txt
Page: 02
Total Pages: 4

                                        
PAGE 3 RHDIAAA6455
48TFW              20           F-111F        15 JAN       29 NOV
37TFW              18           F-117          15 JAN         2 DEC   [(b)(1) sec 3.4(b)(5)]
72BTCS              1           CRC            15 JAN         5 DEC
USAFE               1            MPC           15 JAN         5 DEC
48TFW             12            F-111F        15 JAN        11 DEC
36TFW             24            F-15C         15 JAN         28 DEC
4TFW               24            F-15E         15 JAN          3 JAN
52TFW             12            F-4G           15 JAN          3 JAN
TBD(2)             24            F-16            15 JAN          5 JAN
TBD(2)             18            F/A-16        15 JAN          7 JAN
67TRW             12            RF-4C         15 JAN         10 JAN
TBD(2)             18            A-10            30 JAN         15 JAN
USAFE             18            A-10            30 JAN         23 JAN
8 ASOC              1            ASOC          15 JAN          TBD
552AWACW      4             E-3              ON CALL     TBD
37TFW               6             F-117           ON CALL     TBD   [(b)(1) sec 3.4 (b)(5)]
347TFW            24            F-16             ON CALL     TBD
USAFE              24            F-16             ON CALL     TBD
NOTE 1: PROPOSED DEPLOYMENT/CLOSURE DATES AND BEDDOWN LOCATIONS
PENDING USCENTCOM CONCURRENCE.


PAGE 4 RHDIAAA6455
NOTE 2: PENDINCG CALL-UP.
NOTE 3: OH CALL UHITS MUST CLOSE IN A-OR WITHIN  [(b)(1) sec 3.4(b)(5)]
NOTIFICATION.
2.  (U) COORDINATING INSTRUCTIONS.
A. (U) ANTICIPATED LENGTH OF OPERATION: TBD.
B. (U) C-DAY/L-HOUR: 071700Z AUG 90.       
C. (U) CODE NAME FOR OPERATION IS: DESERT SHIELD.
3.  (U) UNITS SHOULD PLAN TO DEPLOY WITH APPROPRIATE MISSION ORIENTED
PROTECTIVE POSTURE (MOPP) GEAR.
4.  (U)  TAC UNITS WILL CIT UNIT FUNDS WITH ESP CODE VA (VICTOR ALPHA)
TO TRACK ALL COSTS FOR AFTER THE FACTI FUNDING.
5. LOGISTICS AND ADMINISTRATION.
A.   THE TCS FOR EACH DEPLOYING UNIT ARE CONTAINED IN [(b)(1) sec 3.4 (b)(5)]
SK.
B.  (U)  AIRLIFT MOVEMENT PRIORITY. lB1.
C.  (U)  USE THE FOLLOWING LOAD PLANNING FACTORS FOR AIRCRAFT:
C-141 - 22.5 SHORT TONS (ST)
C-5 - 7D ST
D. {U) UHIT LOAD PLANNERS SHOULD EHSURE THAT THEIR AVIATION SUPPORT
PACKAGE INCLUDES AN AIRCRAFT LOAD DESlGNATED AS AN ENROUTE SUPPORT


PAGE 5 RHDIAAA6455
TEAM AIRCRAfT (ESTA). ESTAS WILL BE PROVIDED AS PRIORITIES AND
    RLIFT ASSETS ALLOW. ENSURE THE ESTA 1S LOAD PLANNED FOR A FULL
AIRCRAFT LOAD IAW SPECIFIED PLANNING FACTORS, I.E. 22.5 SHORT TONS
FOR A C-141 (CARGO AND PAX).
 

Document Page: First | Prev | Next | All | Image | This Release | Search