IMMEDIATE

			BASE COMMUNICATIONS CENTER
				390 COSQ/DONA

PAGE 03 OF 04 		RUFLPIA 0791			31/0915Z
				61-0302/R: FUEL CELL (TROUBLESHOOTING)
				58-0053.E PHASE DAY ONE. (MIGHTY EXPRESS)
(4)	(U) MMS NO CHANGE.
(5)	(U) OMS: AIRCRAFT 6509 TRANSFERED TO JEDDAH. NINE AIRCRAFT
PAA.
BT
#0791
NNNN


					SECTION 2 OF 2
(6) 	(U) SUPPPLY: NO COMMENT.
(7) 	(U) GENERAL NO COMMENT.
3.	INTELLIGENCE NO COMMENT.
4.	COMMUNICATIONS: GOOD TO HEAR WE ARE GETTING THE 8 ATT

					[(b)(1)sec3.4 (b)(5)]



5.	PERSONNEL
MAJCOM	OFFICER	ENLISTED	FEMALES
SAC
MAC
ATC
COM		[(b)(1) sec 3.4 (b)(5)]
TAC
USAFE
TOTAL
TOTAL MILITARY
TRANSIENT PERSONNEL:	98
(TRANSIENTS ARE PERSONNEL WHO RON BETWEEN ONE AND TEN NIGHTS)
CIVILIANS: 3
TOTAL PERSONNEL: [(b)(1) sec 3.4 (b)(5)]
6. (U) COMBAT SUPPORT GROUP: FIFTY TENTS SOURCED FROM INTRA
THEATRE. HOST BASE WILL SOURCE 20 ADDITIONAL. REQUEST BARKSDALE
THEATRE. HOST BASE WILL SOURCE 20 ADDITIONAL. REQUEST BARKSDALE
SHIP REMAINING PLYWOOD AND 2/4 STUDS. FOOTLOCKERS ARE AVAILABLE.
LIMITED SLEEPING BAGS ARE AVAILABLE, ENSURE DEPLOYED PERSONNEL BRING
"A" BAGS.
7. (U) SERVICES: NO COMMENT.
8. (U) CIVIL ENGINEERING. RUNWAY REPAIR GOING SLOWLY. THE BASE
COMMANDER IS NEGOTIATING A MUTUALLY ACCEPTABLE TIME WITH THE SPANISH
WING COMMANDER. IN ANSWER TO THE DEMIN WATER QUESTIONS, WE HAVE
THREE PLANTS OPERATING AND WILL REINSTALL THE FOURTH TODAY. EACH
WILL PRODUCE 900 GAL./HR. OUR TOTAL STORAGE CAPACITY IS 65, 000 GAL.
WE RESTORED THE SEWAGE PLANT TO OPERATIONS. WE HAVE SHOVELED OUT ONE
SLUDGE SED. THE EMPTIED THE TANK AND RESET THE VALVES. THE EFFLUENT WAS
STARTING TO CLEAR AS WE LEFT. EXTERIOR ELECTRIC IS REPLACING THE
AIRFIELD LIGHTS. YESTERDAY WE REPLACED TWO STORAGE AND 8 EDGE
LIGHTS. THE AIR CONITIONING IS BLDG 1411 FOR AMS WILL BECOME
CRITICAL BY SPRING. WE HAVE GIVEN A BILL OF MATERIALS TO THE LOCAL
CE FOR PROCUREMENT. THE C-130 WITH THE ADDITIONAL TENTS, HEATERS
AND OTHER MATERIALS IS SCHEDULED TO ARRIVE TODAY. THE NEW TENT CITY
MUST HAVE LATRINES, SHOWERS, AND WASHERS/DRYERS BEFORE THE ADDITIONAL
PEOPLE ARRIVE. HARD LATRINES ARE BEING CONTRUCTED BY THE HOST, BUT
THE FIRST SET TOOK ALMOST THREE WEEKS TO FINISH. WE NEED TO RELIEVE
THE PRESSURE IN THE GYM.POOL HOUSE. FOR 500 PEOPLE IN TENT CITY
NUMBER 2, WE HAVE 10 SHOWERS, 6 URINALS, AND 5 COMMODES. CURRENT
TENT CITY ASSETS ON-HAND:
TENTS 			0
TENT LIGHT KITS 		0
HEATERS 			31 + 20 BROKEN