Document Page: First | Prev | Next | All | Image | This Release | Search

File: aacqt_02.txt
Page: 02
Total Pages: 3

 IMMEDIATE
  BASE COMMUNICATIONS CENTER -
 39O COSQ/DONA -
 PAGE 02 OF 03 RHIUFAA 2272 18/0744Z
 AIR-TO-AIR (TNG) 			18 		24 		42
 AIR-TO-GROUND (TNG) 		248 		44 		292
 TAC RECCE 			6	 			6
 STRAT RECCE (U-2, TR-1, RC-135) 	5 				5
 EC (F-4G EF-111, EA-6) 		33 		2 		35
 EC-130 (V5), CC, ABCCC) 		5 				5
 AWACS 				2 				2
 AIR REFUEL 			64 		4 		68
 AIRLIFT 				219 				219
 TOTAL 				624 		104 		728
.2. LOGISTICS: COMUSCENTAF TOP PRIORITIES ARE: RESUPPLY/WRSK,
 MORTUARY AFFAIRS/MORGUES HARVEST FALCON ASSETS, FORKLIFTS, AD FIRE
 OPS/CRASH RESCUE EOUIPMENT. REQUIRE WATER SYSTEM COMPONENTS (PIPE
 RACKS FITTING COTAINERS} TO SUPFORT CAIRO WEST. AIRLIFT TO CAIRO
 WEST REQUIRED ONCE ASSET AVAILABILITY IS COMFIRMED. ADDITIONALLY,
 REQUIRE THREE 3K STAVE TANKS AND ONE FIRE TRANSFER PUMP AIRLIFTED TO
 CAIRO WEST. COMFIRING 16 OCT TELECON BETWEEM USCENTAF/LGX AND HQ
 TAC/LGX, REQUEST RRR KIT AT MCLB ALBANY BE SHIPPED TO THUMRAIT;
 SURFACE MOVEMENT ACCEPTABLE. LOGSTAT 059, PARA 2 (D) INCLUDES
 REVALIDATED FORKLIFT REOUIREMENTS. REMAINING SHORTFALLS IN FIRE
 OPS/CRASH RESCUE EOUIPMENT ARE CONTINUED CONCERN. LOGISTICS
 ASSESSMENT REMAINS SATISFACTORY.
 A.  MAINTENANCE: OVERALL AIRCRAFT MC RATE 1S 89.2 PERCENT. FUEL
 CELL FOAM FOR F-4G 7571 ARRIVED AND IS BEING INSTALLED. OUR THANKS
 TO THOSE INVOLVED IN LOCATING AND MOVING THIS SHIPMENT. ADDITIONAL
 72 HOURS OF DOWN TIME WILL BE REQUIRED FOR CURE OF SEALANT ONCE MAINTENANCE 
IS COMPLETED. PRATT AND WHITNEY REP'S ARE AT THUMRAIT TO
 FURTHER EVALUATE ENGINE GLAZING ON PW-220 ENGINES. TWO SERVICEALE
 SPARE F-110 ENGINES ARRIVED AT DOHA.
 B.  SUPPLY: MICAP NMCS REQUIREMENTS TOTAL 388. TOTAL MICAP'S
 DECLINED FOR PAST 3 D^YS, THOUGH NUMBER OF AIRCRAFT NMCS INCREASED.
 AGAIN WE SUPPORT "DESERT EXPRESS" CONCEPT AMD ENCOURAGE EARLY
 IMPLEMENTATION. THESE AND OTHER FINE TUNING PROCEDURES CURRENTLY
 BEING ESTABL1SED SHOULD HELP CONTINUE DOWNWARD TREND 1N MICAP'S.
 C.  (U) MUNITIONS
 (1) SHORTFALLS:
 TYPE SHORTFALL
 CBU-87' 1139
 AGM-65' 1303
 ' THESE ITEMS ARE BEING DOWNLOADED AT PORT. WILL OROP FROM SITREP
 WHEN OUANTITIES ARE VERIFIED BY GAINING UNITS.
 (2) NEW DEPOT AT AL KHARJ EXPECTED TO BE FULLY OPERATIOAL BY 1
 MOV. MUNITIONS MAY BE RECEIVED SOONER. DETAILS ON COM, EQUIPMENT,
 ETC, WILL BE PROVIDED AS AVAILALE. USCENTAF/DE IS BUILDING UTC FOR
 33 ADDITIOMAL 46XXX PERSONNEL.
 3. ENGINEERIG AND SERVICES: USCENTAF/DE TOP PRIORITIES ARE:
 FORCE EEDDOWN, OPERATION SUPPORT, AND TRASITION FRO TENTAGE TO
 TEMPORARY FACILITIES. CURRENT EMPHASIS IS ON CONNECTION TO
 COMMERCIAL UTILITIES, MUNITONS STORAGE AREAS, AND POL STORAGE CAPABILITY. 
 -PRIME BEEF: FIVE MAN BARRIER MAINTENANCE TEAM FROM 
 7002 CES ARRIVED TO ASSIST WITH BARRIER INSTALLATIONS. VALIDATED
 REQUIREMENT FOR B-1 REVETMENT KITS AT DOHA AND FOR 24 AT SHAIKH ISA.
 FIRE PROTECTION: DISTRIBUTED REMAINDER OF INITIAL RESCUE
 TOOLS TO SITES. PROVIDE CONSOLIDATED CHEMICAL UNDERGARMENT-
 REQUIREMENT FOR FIREFIGHTERS TO USCENTAF REAR/BS-DE FOR PROCUREMENT.
 THIRD P-19 CRASH TRUCK RECEIVED AT TAIF.
 (U) PRIME RIBS: ADDITIOMAL INFORMATION REQUIRED BY USCENTAF
 REAR/BS TO HELF EXPEDITE PURCHASE OF REPLACEMENT PARTS FOR TACTICAL
 FIELD LAUNDRIES. SITES PROVIDED THESE DATA.
 D. PRIME FARE: EIGHTEEN SITES NOW HAVE OPERATIONAL TACTICAL
 FIELD EXCHAGES (TFE). AL DHAFRA IS LAST-SCEDULED TFE TO OPEN AND
 WILL OPEN TODAY.
 4. PERSONNEL:
 LOCATION 	STRENGTH 	GAINS		LOSSES 		TOTALS 	FEMALES
 - 		OFF/ENL 	OFF/ENL	 OFF/ENL 	OFF/ENL 	OFF/ENL 
 AL AYN 	239/1016 	1/0 		0/0 		240/1016 	4/59
 AL DHAFRA 	237/1 		969 0/2 		1/0 		235/1971 	25/123
 AL JUBAYL 	5/63		 0/0 		0/0 		5/63 		0/0 


Document Page: First | Prev | Next | All | Image | This Release | Search