Document Page: First | Prev | Next | All | Image | This Release | Search
File: 111396_aacvv_02.txtTSC-94A HAS ARRIVED. YET WITHOUT ENGINEERING DATE AND SATELLITE ACCESS THE FACILITY CANNOT BE ERECTED. AWAITING AZIMUTH, ELEVATION AND CUT SHEETS. -COMMANDERS COMMENTS: WATER SYSTEM FOR TENT CITY IS STILL NEEDED BEFORE WE CAN GET THE LATRINE AND SHOWERS SET UP. LAST NIGHT WE CAUGHT TWO EGYPTIANS IN TENT CITY STEALING ITEMS FROM ONE OF THE TENTS. TURNED THEM OVER TO LOCAL AUTHORITIES. THIS HIGHLIGHTS THE NEED FOR ADDITIONAL CONCERTINA WIRE TO SECURE THE CAMP PERIMETERS. WE HAVE REQUESTED THIS EARLIER, NEED YOUR HELP. MAC WILL PULL THEIR ALCE OUT NEXT WEEK. 22 AF SAYS THE MAC FLOW THROUGH HERE IS FINISH- ED. WE STILL NEED A REGULAR RESUPPLY RUN AND HAVE MADE EFFORTS TO GET INTO THAT FLOW, BUT STILL HAVE NO STATUS ON THAT REQUEST. WEAR -AND-TEAR ON AIRCRAFT TIRES DUE TO HIGH FOD HAZARD HERE AND THE LACK OF A RUNWAY SWEEPER MAKES THE NEED FOR A 30 TON JACK FOR TIRE CHANGES A CRITICAL ITEM. PILOT LANDINGS ARE KEPT TO ONE EACH SORTIE PER PILOT AND CO-PILOT PROFICIENCY IS ALREADY STARTING T0 DETERIORATE BECAUSE OF INEXPFERIENCE AND LACK OF LANDINGS.
Document Page: First | Prev | Next | All | Image | This Release | Search