      TSC-94A HAS ARRIVED.  YET WITHOUT  
     ENGINEERING DATE AND SATELLITE ACCESS THE           
FACILITY CANNOT BE ERECTED.  AWAITING
    AZIMUTH, ELEVATION AND CUT SHEETS.
    -COMMANDERS COMMENTS: WATER SYSTEM FOR TENT CITY IS STILL NEEDED
    BEFORE WE CAN GET THE LATRINE AND SHOWERS SET UP. LAST NIGHT WE
    CAUGHT TWO EGYPTIANS IN TENT CITY STEALING ITEMS FROM ONE OF THE
    TENTS. TURNED THEM OVER TO LOCAL  AUTHORITIES. THIS HIGHLIGHTS THE
    NEED FOR ADDITIONAL CONCERTINA WIRE TO SECURE THE CAMP PERIMETERS.
    WE HAVE REQUESTED THIS EARLIER, NEED YOUR HELP. MAC WILL PULL THEIR
    ALCE OUT NEXT WEEK. 22 AF SAYS THE MAC FLOW THROUGH HERE IS FINISH-
    ED. WE STILL NEED A REGULAR RESUPPLY RUN AND HAVE MADE EFFORTS TO
    GET INTO THAT FLOW, BUT STILL HAVE NO STATUS ON THAT REQUEST. WEAR
    -AND-TEAR ON AIRCRAFT  TIRES DUE TO HIGH FOD HAZARD HERE AND THE LACK
    OF A RUNWAY SWEEPER MAKES THE NEED FOR A 30 TON JACK FOR TIRE
    CHANGES A CRITICAL  ITEM. PILOT LANDINGS ARE KEPT TO ONE EACH
    SORTIE PER PILOT AND CO-PILOT PROFICIENCY IS ALREADY STARTING T0
    DETERIORATE BECAUSE OF INEXPFERIENCE AND LACK OF LANDINGS.