TSC-94A HAS ARRIVED. YET WITHOUT
ENGINEERING DATE AND SATELLITE ACCESS THE
FACILITY CANNOT BE ERECTED. AWAITING
AZIMUTH, ELEVATION AND CUT SHEETS.
-COMMANDERS COMMENTS: WATER SYSTEM FOR TENT CITY IS STILL NEEDED
BEFORE WE CAN GET THE LATRINE AND SHOWERS SET UP. LAST NIGHT WE
CAUGHT TWO EGYPTIANS IN TENT CITY STEALING ITEMS FROM ONE OF THE
TENTS. TURNED THEM OVER TO LOCAL AUTHORITIES. THIS HIGHLIGHTS THE
NEED FOR ADDITIONAL CONCERTINA WIRE TO SECURE THE CAMP PERIMETERS.
WE HAVE REQUESTED THIS EARLIER, NEED YOUR HELP. MAC WILL PULL THEIR
ALCE OUT NEXT WEEK. 22 AF SAYS THE MAC FLOW THROUGH HERE IS FINISH-
ED. WE STILL NEED A REGULAR RESUPPLY RUN AND HAVE MADE EFFORTS TO
GET INTO THAT FLOW, BUT STILL HAVE NO STATUS ON THAT REQUEST. WEAR
-AND-TEAR ON AIRCRAFT TIRES DUE TO HIGH FOD HAZARD HERE AND THE LACK
OF A RUNWAY SWEEPER MAKES THE NEED FOR A 30 TON JACK FOR TIRE
CHANGES A CRITICAL ITEM. PILOT LANDINGS ARE KEPT TO ONE EACH
SORTIE PER PILOT AND CO-PILOT PROFICIENCY IS ALREADY STARTING T0
DETERIORATE BECAUSE OF INEXPFERIENCE AND LACK OF LANDINGS.