Document Page: First | Prev | Next | All | Image | This Release | Search
File: 120596_aacyu_21.txt21 22 2513362 NOV 90 PP PP LG NO 6. ENGINEERING AND SERVICES: USCENTAF/DE TOP PRIORITIES ARE: FORCE BEDDOWN, OPERATION SUPPORT, AND TRANSITION FROM TENTAGE TO TEMPORARY FACILITIES. CURRENT EMPHASIS IS ON OPENING NEW BEDDOWN SITE AT AL KHARJ. IN ADDITION, EXISTING SITES WITH PROJECTED AIRCRAFT GAINS WILL REQUIRE PRIORITY CONSTRUCTION. PRIME BEEF: APPROXIMATELY 42,000 GALLONS OF JET A-1 FUEL SPILLED FROM RUPTURED FUEL BLADDER AT NEW JEDDAH. FUEL REMAINED IN THE BERM AND IS BElNC RETRIEVED FOR DISPOSAL. CURRENTLY WORKING THROUCH HOST NATION CHANNELS TO ASCERTAIN PROPER DISPOSAL OF CONTAMINATED FUEL AND DIKE AREA CLEAN UP. FIRE PROTECTION: FIRE RESPONSE TO FUEL SPILL A1 JEDDA WAS TIMELY. NO INJURIES WERE REPORTED AND NO FIRE AGENT WAS DISPENSED. PRIME RIBS: BIG SUCCESS REPORTED FROM ALL SITES FOR THE THANKSGIVING MEALS. ALREADY FINE TUNING PLANS FOR CHRISTMAS. PRIME FARE: RATIONS MEALS ON-HAND CURRENT DOS THEATER RESERVE B 4,063,014 63 1,920,000 MRE 1,889,769 59 960,000 REMARKS: CONTRACT/HNS MEALS 36,250. LOG100 CAPT ARNOLD MINIMIZED CONSIDERED LGX 5576 NMR WILLlAM M. RIDER, COL, LC, 5576
Document Page: First | Prev | Next | All | Image | This Release | Search