  6. ENGINEERING AND SERVICES: USCENTAF/DE TOP PRIORITIES ARE:
  FORCE BEDDOWN, OPERATION SUPPORT, AND TRANSITION FROM TENTAGE TO
  TEMPORARY FACILITIES. CURRENT EMPHASIS IS ON OPENING NEW BEDDOWN SITE
  AT AL KHARJ. IN ADDITION, EXISTING SITES WITH PROJECTED AIRCRAFT
  GAINS WILL REQUIRE PRIORITY CONSTRUCTION.

      PRIME BEEF: APPROXIMATELY 42,000 GALLONS OF JET A-1 FUEL SPILLED
  FROM RUPTURED FUEL BLADDER AT NEW JEDDAH. FUEL REMAINED IN THE BERM
  AND IS BElNC RETRIEVED FOR DISPOSAL. CURRENTLY WORKING THROUCH HOST
  NATION CHANNELS TO ASCERTAIN PROPER DISPOSAL OF CONTAMINATED FUEL
  AND DIKE AREA CLEAN UP.

      FIRE PROTECTION: FIRE RESPONSE TO FUEL SPILL A1 JEDDA
  WAS TIMELY. NO INJURIES WERE REPORTED AND NO FIRE AGENT WAS
  DISPENSED.

      PRIME RIBS: BIG SUCCESS REPORTED FROM ALL SITES FOR THE
  THANKSGIVING MEALS. ALREADY FINE TUNING PLANS FOR CHRISTMAS.

      PRIME FARE:

RATIONS	MEALS ON-HAND	CURRENT DOS                THEATER RESERVE

  B		4,063,014    	                           63		          1,920,000
 MRE       	 1,889,769 			59			960,000

       REMARKS: CONTRACT/HNS MEALS 36,250.