          1. (U) JULLS NUMBER:  51975-10693 (00003), submitted by ADE, 24 ID,
          870-5516, (912)767-5516.

          2. (U) No type OPN DESERT STORM NOTES conducted by 24 IN DIV (MECH)
          on 05/20/91.

          3. (U) KEYWORDS: ENGINEER, MOBILITY/COUNTERMOBILITY, DEPLOYMENT,

          4. (U) TITLE: DEPLOYMENT OF ENGINEER EQUIPMENT

          5. (U) OBSERVATION: Late deployment of engineer equipment.

          6. (U) DISCUSSION: Engineer equipment was a low priority on the
          divisional deployment list. The limited haul and construction
          assets of the 3d Engineer Battalion (Combat) did not close until
          boat 9 (of 10), and only 2 dozers with no haul arrived on boat
          1. As a result, fighting vehicles and logistic support for lead
          maneuver brigades were often in country but could not be moved
          to required locations due to poor road networks. Also, the 92d
          Engineer Battalion (Combat Heavy), a combat heavy corps asset,
          was not included in the divisional deployment. Once this Fort
          Stewart unit and other combat heavy battalions arrived in
          sector, road networks rapidly improved, making logistics supply
          systems much more effective adding to the divisional combat
          power.

          7. (U) LESSON LEARNED: A heavy division needs sustainment
          eng neer capabilities early in its deployment sequence.

          8. (U) RECOMMENDED ACTION: Schedule engineer equipment early in
          deployment to make logistics more effective. Ensure road
          upgrade and maintenance equipment and engineer combat heavy
          units are available early to build logistics network.



              (U) SUBJECT: OPERATIONS

              (U) INTEROPERABILITY: PLANNING

              (U) Lesson distributed by: 24TH IN DIV.













                                       Page - 5

                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 253 f:/Week-22/BX001437/24 MECH INF DIV AFTER ACTION REPORT/24th mech inf div operation desert storm after a:08029615062350
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001437
Unit = 24TH ID
Parent Organization = XVIII CORPS
Folder Title = 24 MECH INF DIV AFTER ACTION REPORT
Folder Seq # = 785
Subject = 24TH MECH INF DIV OPERATION DESERT STORM AFTER A
Document Seq # = 50
Document Date =
Scan Date = 12-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-AUG-1996