d. N IST (US) AD. IN SECTOR MAXIMIZE PRODUCTION AT CONFIRMED WELL
LOCATIONS; ESTABLISH PRODUCTION CAPABILITY AT SECONDARY SITES AND BE
PREPARED FOR EMERGENCY/SURGE PRODUCTION AT THOSE SITES; AGGRESSIVELY
SEARCH FOR ADDITIONAL POTENTIAL SITES.
e. NJ 1ST (UK) AD. IN SECTOR MAXIMIZE PRODUCTION AT CONFIRMED
WELL LOCATIONS; ESTABLISH PRODUCTION CAPABILITY AT SECONDARY SITES AND BE
PREPARED FOR EMERGENCY/SURGE PRODUCTION AT THOSE SITES; AGGRESSIVELY
SEARCH FOR ADDITIONAL POTENTIAL SITES. IDENTIFY RESOURCE SHORTFALLS
REFERENCE THIS MISSION TO THE CORPS ENGINEER SECTION.
f. N 3RD (US) AD.
(1) IAPR91 INITIATE IMMEDIATE CLEARING OPERATIONS(DPICM\CBU) VIC
SAFWAN. ASSESS AREA REQUIREMENTS, MARK AND CLEAR AS MUCH AS POSSIBLE IN
THE TIME REMAINING IN THE AREA. REPORT REQUIREMENTS ABOVE DIVISIONAL
ENGINEER FORCE CAPABILITIES TO TF DEMO AT THE CORPS TAC. REPORT PROGESS TO
TF DEMO. SAFETY OF U.S. FORCES DURING THIS OPERATION IS PARMAMOUNT.
(2) CONDUCT ROUTE RECONNAISSANCE IN SECTOR FROM QU625360 NW TO
QU475575, SW TO QU345465, AND WEST TO DIVISION REAR BOUNDARY. REPORT ANY
RESTRICTIONS/BYPASS RECOMMENDATIONS TO ASSISTANT CORPS ENGINEER, NLT
011800(C)APR91.
(3) IN SECTOR MAXIMIZE PRODUCTION AT CONFIRMED WELL LOCATIONS;
ESTABLISH PRODUCTION CAPABILITY AT SECONDARY SITES AND BE PREPARED FOR
EMERGENCY/SURGE PRODUCTION AT THOSE SITES, AGGRESSIVELY SEARCH FOR
ADDITIONAL POTENTIAL SITES.
(4) REDUCE THE CURRENT CI TEAM OPERATION IN KUWAIT CITY DIRECTED IN
FRAGO 174-91 TO 1 AGENT FOR LIAISON. OTHER 5 AGENTS REMAIN UNDER 3AD
CONTROL.
g. tN 11 AVN BDE.
(1) PROVIDE AVIATION SUPPORT TO CORPS WATER RESOURCE TEAM (4-5
PERSONNEL) FOR TRANSPORTATION TO POSSIBLE WELL LOCATIONS IN VII CORPS
SECTOR.
ITIONAL POTENTIAL WATER SITES IN
SECTOR. REPORT RESULTS TO THE CORPS WATER RESOURCE TEAM.
h. (Qj 2D ACR.
(1) IN SECTOR MAXIMIZE PRODUCTION AT CONFIRMED WELL LOCATIONS;
ESTABLISH PRODUCTION CAPABILITY AT SECONDARY SITES AND BE PREPARED FOR
EMERGENCY/SURGE PRODUCTION AT THOSE SITES; AGGRESSIVELY SEARCH FOR
ADDITIONAL POTENTIAL SITES.
(2) DESTRUCTION OF ENEMY HELICOPTERS OUTLINED IN FRAGO 190-91 IS
HEREBY RECINDED.
N 7TH EN BDE.
(1) ORGANIZE AND PROVIDE PERSONNEL TO THE CORPS WATER RESOURCE
TEAM. COORDINATE DIRECTLY WITH MSCS FOR TEAM OPERATIONS.
(2) COORDINATE DIRECTLY WITH 11CAB FOR AVIATION SUPPORT 24 HOURS
PRIOR TO REQUIREMENT..
(V 14 MP BDE.
(1) ASSUME RESPONSIBILITY FOR BATTLEFIELD CIRCULATION CONTROL ON
MSR PYLE AND MSR MCDONALD EFF OIOSOO(C)APR91.
(2) COORDINATE WITH 800TIl MP BDE CONCERNING THE TRANSPORT AND
RELEASE OF IRAQI DC FROM U.S. CONTROLLED EPW CAMPS. ASSIST AS REQUIRED.
COORDINATE DIRECTLY WITH VII CORPS MSCS CONCERNING PROPOSED RELEASE SITES
AND RELEASE ROUTES THAT ARE OFF OF AN ESTABLISHED MSR IN THAT MSC SECTOR.
BRIEF G3, VII CORPS, ON THE RELEASE PLAN FOR APPROVAL BEFORE EXECUTION.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 3 f:/Week-24/BX000229/FRAGOS 16 JAN - 10 APR 91/frago 194 91:101196154306148
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000229
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = FRAGOS 16 JAN - 10 APR 91
Folder Seq # = 15
Subject = FRAGO 194 91
Document Seq # = 54
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 11-OCT-1996