Subject: SITREP TF FREEDOM 31 MAR 91
Unit: ARCENT
Parent Organization: CENTCOM
Box ID: BX000494
Folder Title: COMMMAND REPORTS RPTS TASK FORCE FREEDOM 1 OF 2 -1
Document Number: 39
Folder SEQ #: 80
UNCLASSIFIE6
NOVEMBER. THIS WILL ALLOW THE CORPS TO DO A PROPER JOB IN ITS
RESTORATION.
3. COMMUNICATIONS CONNECTIVITY. CAMP FREEDOM HAS TACTICAL
CONNECTIVITY TO THE ENTIRE THEATER COMMUNICATIONS NETWORK. DIRECT
CONNECTIVITY IS PROVIDED TO LOGBASE ALPHA, KKMC, AND ARCENT (MAIN).
DUAL CONNECTIVITY EXISTS TO THE EAC NETWORK.
4. PERSONNEL STATUS.
ENL wo OFF civ TOTAL
HHC ARCENT 80 1 42 0 123
352D CA CMD 113 1 121 38 273
22D SPT CMD 910 22 79 0 1011
44TH SIG BN 123 1 9 0 133
2D AVN BDE 109 31 18 0 iss
372D MP CO 141 0 4 0 145
513TH MI (TF) 20 3 6 0 29
8TH PSYOP BN I 0 1 0 2
1ST EOD 69 0 13 0 82
MEDCOM FWD 300 7 85 0 392
TOTAL 1866 66 378 38 2348
5. (U) LOGISTICS.
A. (U) CLASS I
TYPE DOS REMAINING
MRES 7.3
T/B"S 11.8
MORES 27.2
H20(BTLD) 10.0
H20(BULK) 2.1
SUNDRIES 29.3
C. (U) CLASS III
TYPE ISSUED REMAINING
DF2 94,385 GAL 124,780 GAL
MOGAS 15,255 GAL 17,144 GAL
JET"All 11,600 GAL 58,000 GAL
D. (U) TOTAL OF SIX BATH AND TWO LAUNDRY LOCATIONS ARE
CURRENTLY OPERATIONAL.
6. (U) COMMANDER'S EVALUATION.
A. (U) THE IMPROVEMENT OF KUWAIT'S INFRASTRUCTURE CONTINUES
UMEROUS AREAS. KUWAITI BANKS ARE REMAINING OPEN LATE TO
ACCOMODATE INCREASED CUSTOMER DEMAND DURING THE CURRENCY CONVERSION
PERIOD. THE RAS AZ ZOUR POWER PLANT IS EXPECTED TO PROVIDE 700
MEGAWATTS OF POWER TO KUWAIT CITY BY 4 APRIL. CCATF FACILITATED AN
EOD CLASS FOR EMPLOYEES OF THE KUWAIT OIL COMPANY (KOC), AND OIL
FIELD FIREFIGHTING TEAMS. HEAVY FIREFIGHTING EQUIPMENT ARRIVED AT AS
SHUAIBA PORT AND IS CURRENTLY BEING OFFLOADED. CCATF WILL SUPPORT
THE WATER POTABILITY TESTING PROGRAM FOR KUWAITI BULK WATER SUPPLIES
BEING CONDUCTED BY THE COMMONWEALTH LABS. CONCERN CURRENTLY EXISTS
OVER THE NEW EMPLOYMENT CONTRACTS BEING GRANTED TO THIRD COUNTRY
NATIONALS WORKING IN KUWAIT. THE CONTRACTS ARE FOR A PERIOD OF ONLY
THREE MONTHS, RATHER THAN THE PRE-WAR STANDARD OF ONE YEAR. THIS IS
RAISING THE LEVEL OF UNCERTAINTY FELT BY TCN WORKERS. AN ADDITIONAL
ITEM OF INTEREST IS THAT THE CONTRACTS ARE NOW WRITTEN ONLY IN
ARABICT RATHER THAN THE DUAL LANGUAGE CONTRACTS THAT WERE ISSUED
PRIOR TO THE WAR.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 5 f:/Week-33/BX000494/COMMMAND REPORTS RPTS TASK FORCE FREEDOM 1 OF 2 -1/sitrep tf freedom 31 mar 91:11089615144832
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000494
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = COMMMAND REPORTS RPTS TASK FORCE FREEDOM 1 OF 2 -1
Folder Seq # = 80
Subject = SITREP TF FREEDOM 31 MAR 91
Document Seq # = 39
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996