Document Page: First | Prev | Next | All | Image | This Release | Search

File: 121096_sep96_decls6_0004.txt
Page: 0004
Total Pages: 4

Subject: 24 MECH INFANTRY DIV COMBAT TEAM HISTORY DURING DESERT STORM    

Unit: ARCENT      

Parent Organization: CENTCOM     

Box  ID: BX000530

Folder Title: 24 MECH INFANTRY DIV COMBAT TEAM HISTORY DURING DESERT STORM                                    

Document Number:          3

Folder Seq  #:         16









                  soldier - one set with the battalion logistics element (field trains), and another
                  set with the DISCOM. If CPOGs became contaminated, replacements were
                  readily available. 'PB" tablets were also distributed to increase the effects of
                  the Atropine Nerve Agent Antidote if soldiers were exposed to enemy nerve
                  agents.


                     The Division was task organized to operate in a chemical environment.
                  Decontamination platoons were attached to the lead combat brigades, the
                  FOX chemical reconnaissance platoon was attached to the Division Cavalry
                  Squadron, and the 327th Chemical Decontamination Company was placed in
                  general support of DISCOM.


                                                  Planning Priorities


                     Given the estimate of the enemy situation and the magnitude of the 24th
                  Infantry Division (Mech) attack, Major General Barry McCaffrey (Commanding
                  General) established the following planning priorities. First, the Division had
                  to think through it's command, control, and communications (C3)
                  arrangement. Second, it Would need to develop an ambitious yet executable
                  supporting logistics and sustainment plan.       Finally, once the "operational
                  envelopes" for the C3 and logistics plan were known, a ground maneuver
                  plan could be developed.


                             COMI  WAND, CONTROL, AND COMMUNICATIONS PLAN


                     Major General McCaffrey would command his division through an echelon
                  of five command posts.


                     a. Division Rear Command Post (DREAR): This was the rearward-most of
                  all Division command and control centers.          From this location, Brigadier
n G-1), Lieutenant Colonel Ken
                  Koetz (G-4), Lieutenant Colonel Ben Hall (Division Surgeon), and a cross-
                  section of the Division primary and special staffs would orchestrate the
                  complicated task of personnel replacements, logistics, and medical
                  evacuation. A Weapon System Replacement Operation (WSRO) company

                                                          9

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 4 f:/Week-42/BX000530/24 MECH INFANTRY DIV COMBAT TEAM HISTORY DURING DESERT STORM/24 mech infantry div combat team history during :12069615463029
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-42
Box ID = BX000530
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = 24 MECH INFANTRY DIV COMBAT TEAM HISTORY DURING DESERT STORM
Folder Seq # = 16
Subject = 24 MECH INFANTRY DIV COMBAT TEAM HISTORY DURING
Document Seq # = 3
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 06-DEC-1996