Document Page: First | Prev | Next | All | Image | This Release | Search

File: 123096_jun96_decls11_0002.txt
Page: 0002
Total Pages: 3

Subject: CDR VII CORPS GUIDANCE NO 3 30 JAN 91                           

Unit: VII CORPS   

Parent Organization: ARCENT      

Box  ID: BX000213

Folder Title: VII CORPS COMMANDERS GUIDANCE                                                                   

Document Number:         29

Folder Seq  #:          4





                                        UNCLASSIFIED



                           C,):,:-T,,TAF: THV, CCALITIC@l@4 AIR
             AFFECT IRAQI COMBAT EFFECTIVENESS. AIR STRIKES HAVE REDUCED THE
             ARTILLERY OF @114E 12AR, 20I@T, 6AR AND IOAR DT,VS BELOW 70%, THAT OF
             THE 25!D AND 36!D BELOW 50%. ARMO@ IN THE 231D AND 2OTD SECTORS
             HAS BEEN REDUCED TO 85 AND 83% RESPECTIVELY. TODAY'S ATO TARGETS
             540 FIGHTER AND 25 B52 SORTIES AGAINST THE '@RGFC. FOUR B52S WILL
             FOLLOW UP YESTERDAY'S PSYO@ LEAFLET DROP ON THE 201D WITH 750#
             BOMBS.


             3-       IMMIENTIONS.


                 A.        LESS THAN 72 HOURS. NO CHANGE. THE POINT OF MAIN
             EFFORT REMAINS PREPARATION FOR COMBAT IN TAA JUNO.

                 B.        BEYOND 72 HOURS. NO CHANGE. RECOGNIZE THAT 15 FED
             IS AT THIS POINT ONLY A PLANNING DATE FOR G-DAY.


             4.       PRIORITIES.


                 A.        FY@RES. NO CHANGE.


                 B.        ENGINEER.


                      (1)       D+15: PREP EVAC HOSPITALS 4 AND 5.

                      (2)       D+!C): HELIPAD LBA (AMMO), PREP ASP 3,

                 C.        AIR DEFENSE. NO CHANGE.


                 D.        IN@IELLIGENCE PRIORITIES.


                      (1)       REVISED PRIORITIES:

                           (A)        AREA WEST/NORTHWEST OF 251D,


                           (B)        BREACH SECTOR.


                           (C')       WADI AL BATIN.


                           CD)        12AD/1'7AD/TAWAXALNA MD


                           'F-)       10AD/6AD.


                      (2)       PIR. UNCHANGED.

                 E,        SUSTAINMENT.

                      (1)       THE CORPS SUS-AINMEMT PRIORITY CONTINUES TO BE
             THE BUILD UP OF LOG BASE ECHO. LBE CAPABILITIES CONTINUE TO
             'IMPROVE WITH INCREASES IN ON HAND FUEL STOCXAGES (3.3M GAL),

             PRODUCTION HAS BEGUN AND APPROVED FOR USE. ADDITIONALLY,
             PREPARATION FOR ESTABLISHMENT OF THE 13TH EVACUATION HOSPITAL HAS
             STARTED.


                      (2)       AMMUNITION PACKAGES FOR ARTILLERY PREP F@'RES
             HAVE BEEN BUILT AT LB ALPHA AND ARE BEING SHIPPED TO ASP 2. ASP


                             1 lkirl ACZCZI@l@rl

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 3 f:/Week-24/BX000213/VII CORPS COMMANDERS GUIDANCE/cdr vii corps guidance no 3 30 jan 91:12179611151824
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = VII CORPS COMMANDERS GUIDANCE
Folder Seq # = 4
Subject = CDR VII CORPS GUIDANCE NO 3 30 JAN 91
Document Seq # = 29
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 17-DEC-1996