Document Page: First | Prev | Next | All | Image | This Release | Search

File: 970107_sep96_decls11_0003.txt
Page: 0003
Total Pages: 11

Subject: OPERATIONS SUMMARY 21 TO 22 MAR 91                              

Unit: VII CORPS   

Parent Organization: ARCENT      

Box  ID: BX000269

Folder Title: DAILY STAFF JOURNALS-23 MAR 91-2                                                                

Document Number:         19

Folder Seq  #:         44


                                  UNit,LASSIFIED




            DIVISION IS PREPARED FOR DEFENSE OF NORTIIERN KUWAIT, AND

            CONTINUES TO PLAN REDEPLOYMENT OPERATIONS. DIVISION IS PREPARED


            FOR OFFENSIVE OR DEFENSIVE OPERATIONS.
                    (4)(Ui\  2ACR. REGIMENT CONTINUED TO CONDUCT MSR RECONS
            TO ESTABLISI--I EXTENT OF COMPLETION. THE R'PAC AND RSS HAVE


            DEPLOYED NORTH TO OCCUPY POSITIONS IN NEW SECTOR. DRAGOON REAR


            HAS BEEN ESTABLISHED AT KKMC, NR 469777. REGIMENT IS PREPARING

            SCREEN AND SECTOR ASSUMPTION PLANS FOR ON ORDER MISSIONS.
                    (5)(UIX l(UK)AD. DIVISION MAIN EFFORT IS ON

            REDEPLOYMENT AND MAINTENANCE. EXTRACTION OF TROOPS PROGRESSES

            WELL. 39 HY ARTY REGT, 12 AD REGT, AND 32 HY ARTY REGT NOW IN

            RECOVERY AREA PREPARING FOR SEA MOVE. MAXIMUM PREPARATION


            CONTINUES ON 7TH BDE VEIIICI,ES PRIOR TO HANDOVER FOR SEA MOVE.


            4TII BDE CONTINUES WITH LOW LEVEL TRAINING IN SECTOR. RANGES


            CONTINUE TO BE UTILIZED BY TROOPS. RIIINO RANGE (QT 630563) WILL

            BE TURNED OVER TO US FORCES ON WITliDRAWAL OF DIVISION. PLANNING


            CONTINUES FOR RECOVERY AND REDEPLOYMENT OF DIVISION. DIVISION


            MAIN WILL RE-LOCATE TO AL JUBAYL ON 23 MAR. 4TH BDE REDEPLOYMENT


            WILL BEGIN ON 28 MAR. PREPARED FOR FUTURE OPERATIONS WIT--' 4TH


            BDE AND DIVARTY.
                    (6)(U Y\) 1ID(M). DIVISIO-N IS OCCUPYING AA ALLEN IN IA@Q.
            IST BDE IS IVE PU 640272; 2ND BDE AT PU 634402; 3R!-) BDE AT PU

            472458; AND 4TIl BDE AT PU 532252. TRANSPORTATION OF

            SILKWORM MISSILES FROM TIlj',IR STORAGE SITE BEGAN AT 221800C, AHEAD

            OF SCHEDULE. DIVISION IS CONDUCTING PRELIMINARY COORDi@g.AckY61i"VOR

            THE ASSUMPTION OF PORTIONS OF XVIII ABC SECTOR. PLANS ARE



                                             3





                                   UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 11 f:/Week-42/BX000269/DAILY STAFF JOURNALS-23 MAR 91-2/operations summary 21 to 22 mar 91:01029718422429
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-42
Box ID = BX000269
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = DAILY STAFF JOURNALS-23 MAR 91-2
Folder Seq # = 44
Subject = OPERATIONS SUMMARY 21 TO 22 MAR 91
Document Seq # = 19
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-JAN-1997