Document Page: First | Prev | Next | All | Image | This Release | Search
File: 971208_sep96_decls2_0015.txt
Subject = OPERATIONS DESERT SHIELD 82D ENGINEER BATTALION 28 AUG 91
Box ID = BX000301
Folder Title = 82D ENG BN AFTER ACTION REVIEW COMMENTS 5 APR 91
Unit = VII CORPS
Parent Org = ARCENT
05 Jan 91: CSM Henson goes to Dammam with a 40 ton tractor trailer
to pickup an order for the Dynamite Base PX. The 7th EN Brigade
hold a Commanders' meeting. The staff presents a coarse of actions
briefing to the Commmander.
06 Jan 91: CSM Henson and M916 and trailer arrive back from Port
with items for Dynamite Base PX. Demonstration Number 2 of the
Rapid Deployment Sled (a.k.a. 'Schnorrbusch Sled') is set for
today. The bangalores are reinforced with metal rods welded every
few feet. The RDS makes a successful run. A Company joins 2/2 ACR
for the first maneuver training conducted in the Regiment. The
three day FTX focuses on Squadron maneuver and offensive battle
drills. A Company perfects its company wedge formation, with
platoons in diamond. Wheeled vehicles are integrated into the
Squadron field and combat trains.
07 Jan 91: The Dynamite Base FN annex has its Graid Opening. 2ACR
CPX OPORD is issued to Company Commanders. The Battalion receives
an OPORD from 2ACR for the defense of LBA. In case of a preemptive
strike, Blue Babe and the 2ACR are the only combat units in sector.
08 Jan 91: D Company sends dozers, bucket loaders, and SEE to the
87th Maintenance Battalion to assist in the construction of a
perimeter berm and survivability positions. The mission is
completed on the gth.
10 Jan 91: AiLno, which previously was issued and held by squad
leaders, is issued to soldier level. B Company sends a SEE out for
the day to construct survivability positions for the 87th Chemical
Company. The Battalion deploys for a CPX.
11 Jan 91: Battalion participates with 2ACR in a CPX. 2ACR sets up
a SIMCTR and the Companies send out their TOC. HHC's participation
is the Battalion TOC, ALOC, and company operations. The exercise
plan used is tailored after a possible scenario for upcoming future
operations. The CPX is fast and furious. It seems that the 2ACR
is literally racing toward BASRAH. Spot reports become so numerous
that they are difficult to manage. The Iraqi forces utilize
chemical munitions and more than half of a line company becomes
casualties after being caught in an artillery barrage.
12 Jan 91: Commander attends 7th EN Brigade meeting.
13 Jan 91: TIUMINT sources report that Iraq will launch a preemptive
attack tomorrow at 0300. The CPX is cut short and the Battalion
moves back to the base camp. The move back is during the evening
in a torrential rain. It takes 3-1/2 hours to go 17 milesl
Document Page: First | Prev | Next | All | Image | This Release | Search