Document Page: First | Prev | Next | All | Image | This Release | Search
File: 971208_sep96_decls2_0053.txt
Subject = OPERATIONS DESERT SHIELD 82D ENGINEER BATTALION 28 AUG 91
Box ID = BX000301
Folder Title = 82D ENG BN AFTER ACTION REVIEW COMMENTS 5 APR 91
Unit = VII CORPS
Parent Org = ARCENT
36. PROJECT: Burial detail. I Mar 91.
DESCRIPTION: Buried Iraqi dead.
EQUIPMENT: SEE - 6 hours
MAN HOURS: 6
UNIT: D Company, 82nd Engineer Battalion
37. PROJECT: Clear Kuwait City Military Airfield
DESCRIPTION:: Removed debris from 600 meter section of the
airfield.
EQUIPMENT: ACE - 16 hours
M916 - 120 km
Bucket Loaders - 32 hours
M548 - 80 km
Fuel Heavy Equipment Mobile Tactical
Transport(HEMMT)-80 km
MAN HOURS: 184
UNIT: D Company, 82nd Engineer Battalion
38. PROJECT: Destroy abandoned Iraqi vehicles and equipment.
DESCRIPTION: Destroyed 354 targets and surveyed 113 additional
targets within the 2ACR and IID areas of operation in Iraq and
Kuwait. 4 - 31 Mar 91.
EQUIPMENT: 9 Armored Personnel Carriers(APC)
MAN HOURS: 2208
UNIT: A Company, B Company, C Company, D Company, 82nd
Engineer Battalion; 84th Engineer Company
39. PROJECT: 2ACR redeployment Assembly Area, 12 Mar - 12 Apr 91.
DESCRIPTION: Provided general engineering support in the
construction of the 2ACE redeployment assembly area, to include:
construction of 6.3 km of roads, 11 shower points, a wash rack with
road and staging area, and parking lot; installation of anchor
points for a clamahell tent; digging of two dining facility sumps;
and haul of over 400 tons of gravel.
EQUIPMENT: Graders - 80 hours
SEE - 41 hours
Dozer - 34 hours
M916 - 28 km
Bucket Loader - 75 hours
Document Page: First | Prev | Next | All | Image | This Release | Search