Document Page: First | Prev | Next | All | Image | This Release | Search
File: 950925_3912872.txt/AL QAIM SUPERPHOSPHATE FTLZR PLNT/[ (b)(1) sec 1.3(a)(4) ] Filename:3912872 GENDATE: 950718 NNNN TEXT: ENVELOPE OAAMCIAA YHLADN 4216 0470702-MXOL--YEKDQX. ZNY MMXOL ZKZK OO AAZ DE HEADER O 160654Z FEB 91 [ (b)(1) sec 1.3(a)(4) ] Subject: /AL QAIM SUPERPHOSPHATE FTLZR PLNT/[ (b)(1) sec 1.3(a)(4) ] /CTY:IZ// LOC/ [ (b)(1) sec 1.3(a)(4) ] RMK/ /[ (b)(1) sec 1.3(a)(4) ] /OBJECTIVE: UNK /WEAPONS PLANNED: UNK WITH: TOT: /AIMPOINT 1: CURING-STOR BLDG COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)CURING-STOR AREA /(C)MOD-SEV(C)CONF /(E)BLDG SUSTAINED MOD-SEVERE DAMAGE FROM 2 NEW HITS AT [ (b)(1) sec 1.3(a)(4) ]. ONE CRATER NEXT TO 10-T.3. ROOFING HAS BEEN BLOWN OFF /ON ABOUT 2-3 OF ALL 4 BLDGS. POSS BLAST DAMAGE FROM UNKNOWN ORIGIN /TO BLDGS IN FRONT OF THE 4 CURING BLDGS AT [ (b)(1) sec 1.3(a)(4) ]. /OPTIMAL REPAIR-REPLACE: 030-180 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: 50% OF CURING BLDG HAS /RECEIVED LIGHT DAMAGE TO EXTERNAL SURFACES. /AIMPOINT 2: UI BLDG COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)UI BLDG /(C)MOD (D)CONF /(E)UI BLDG AT [ (b)(1) sec 1.3(a)(4) ] SUSTAINED MODERATE DAMAGE. 90% OF ROOF IS /BLOWN OFF. STOR TANK AT [ (b)(1) sec 1.3(a)(4) ] SUSTAINED SEVERE DAMAGE. PROB /BLAST DAMAGE TO PIPING IN THIS AREA. /OPTIMAL REPAIR-REPLACE: /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: [ (b)(1) sec 1.3(a)(4) ] /IS UNKNOWN. BLDG, PIPES AND AT LEAST 1 STORAGE TANK RECEIVED MOD /TO SEVERE DAMAGE. ESTIMATE 30-60 DAY REPAIR TIME FOR PIPES AND /STOR TANK. ESTIMATE 60-180 DAYS FOR REPAIR OF BLDG. /AIMPOINT 3: POSSIBLE STOR BLDG COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)STOR BLDG /(C)MOD (D)CONF /(E)STOR BLDG SUSTAINED POSSIBLE MOD DAMAGE ON EAST SIDE OF BLDG. /WALLS [ (b)(1) sec 1.3(a)(4) ] TO HAVE BEEN BLOWN-OUT ON THAT SIDE. ROOF IS LIGHTLY /DAMAGED. /OPTIMAL REPAIR-REPLACE: 060-090 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: BLDG SUFFERED MOD DAMAGE. /AIMPOINT 4: UI BLDG COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)UI BLDG /(C)LT (D)CONF /(E)LIGHT DAMAGE TO A SMALL BLDG NEXT TO THE UREA STOR BLDG. POSS /DAMAGE TO CONVEYOR SYSTEM FROM IMPACT CRATER AT [ (b)(1) sec 1.3(a)(4) ] /OPTIMAL REPAIR-REPLACE: 014-030 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: LIGHT DAMAGE SHOULD BE /EASILY REPAIRED. POSS LIGHT OR SUPERFICIAL DAMAGE TO CONVEYOR. /AIMPOINT 5: SMALL SHED COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)SMALL SHED /(C)DES (D)CONF /(E)SHED WAS DESTROYED CAUSING POSSIBLE MOD FIRE DAMAGE TO THE /ADJACENT LARGER BLDG. ADDITIONAL DAMAGE TO THE BLDG TO THE WEST /FROM DEBRIS WAS [ (b)(1) sec 1.3(a)(4) ]. /OPTIMAL REPAIR-REPLACE: /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: SMALL STOR SHED WAS /DESTROYED. LARGER BLDG SUFFERED BLAST AND FIRE DAMAGE AND IS NOT /USEABLE IN ITS PRESENT STATE. /AIMPOINT 6: STORAGE TANK COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)STOR TANK /(C)DES (D)CONF /(E)1 STOR TANK DESTROYED FROM IMPACT OF BOMB, CAUSING PIPES THAT /WERE RUNNING BETWEEN THE ROWS OF TANKS TO DROP. /OPTIMAL REPAIR-REPLACE: 030-060 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: TANK DESTROYED. CONTENTS, /IF ANY, ARE PROBABLY CONTAMINATED. /AIMPOINT 7: MANIFOLD CHOKEPOINT COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)MANIFOLD CHOKEPOINT /(C)SEV (D)CONF /(E)SEVERE DAMAGE TO MANIFOLD CHOKEPOINT FROM BOMD IMPACT SEVERING /STOR TANK FROM FACILITY PIPELINE NETWORK. /OPTIMAL REPAIR-REPLACE: 030-060 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: ACCESS TO STOR TANKS BY /PIPES TEMPORARILY ELIMINATED. /AIMPOINT 8: UI STOR BLDG COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)UI STOR BLDG /(C)LT (D)CONF /(E)BLDG RECEIVED LIGHT DAMAGE TO THE END OF THE BLDG. /OPTIMAL REPAIR-REPLACE: 014-030 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: MOST OF BLDG INTACT. BLDG /FUNCTION UNK. /AIMPOINT 9: 2 STOR BLDGS COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 2 (B)STOR BLDGS /(C)DES (D)CONF /(E)BOTH BLDGS 85% DESTROYED. POSS DAMAGE TO CONVEYOR SYSTEM THAT /LEADS TO YELLOW CAKE EXSTRACTION AREA. /OPTIMAL REPAIR-REPLACE: 030-060 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: POSS SHOP-STOR BLDGS ARE /HEAVILY DAMAGED. BLDGS ARE NOT USEABLE. PIPELINE-CONVEYOR SYSTEM /DISRUPTED. /AIMPOINT 10: STOR BLDG COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)STOR BLDG /(C)MOD (D)CONF /(E)BLDG MODERATELY DAMAGED FROM BOMB BLAST TO ABOUT 20% OF BLDG. /OPTIMAL REPAIR-REPLACE: /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: POSS SHOP-STOR BLDG /RECEIVED MODERATE DAMAGE TO ABOUT 20% OF STRUCTURE. /AIMPOINT 11: PROB STEAM PLANT COORDINATES: /GRID REF: BDA REF BOOK [ (b)(1) sec 1.3(a)(4) ] /PHYSICAL DAMAGE ACHIEVED: /(A) 1 (B)STEAM PLANT /(C)MOD (D)CONF /(E)MODERATE BLAST DAMAGE TO ROOF OF STEAM PLANT. APPROX 50% OF /ROOF BLOWN AWAY WITH DEBRIS BLOWN ON LOWER PORTION OF BLDG. POSS /DAMAGE TO STEAM PIPES AT THE REAR OF BLDG. /OPTIMAL REPAIR-REPLACE: 060-090 DAYS /BEST ASSESSED REPAIR-REPLACE: /BEST ASSESSED PHYSICAL DAMAGE ACHIEVED: PROBABLE INTERNAL DAMAGE /TO BOILERS. COMPLETE DISRUPTION OF PROCESSING COULD OCCUR AT LEAST /TEMPORARILY. /FUNCTIONAL DAMAGE ON THE INSTALLATION (INFERRED): OPERATIONS AT /FACILITY ARE UNLIKELY UNTIL STEAM CAN BE RESTORED AND DAMAGE TO /OTHER PIPELINES IS REPAIRED. THERE IS SUFFICIENT DAMAGE TO /FACILITY TO KEEP IT OUT OF ACTION FOR AT LEAST 30 DAYS. /MISSION ASSESSMENT: [ (b)(1) sec 1.3(a)(4) ] /SOURCES: [ (b)(1) sec 1.3(a)(4) ] /ANALYST REFERENCE [ (b)(1) sec 1.3(a)(4) ], [ (b)(2) ][ (b)(6) ] INFODATE: 0
Document Page: First | Prev | Next | All | Image | This Release | Search