Document Page: First | Prev | Next | All | Image | This Release | Search

File: 082696_d50039_013.txt
Page: 013
Total Pages: 21

          WATER SUPPORT EQUIPMENT PERFORMANCE

                      IN SWA


              EMPLOYMENT CONSIDERATIONS


    o ROWPU CAN PURIFY FRESH. SALT, BRACKISH. OR NBC
      CONTAMINATED SOURCES

    o PRODUCTION RATES DECREASE AS SALT iNCREASES
      OVER 35.000 PPM

    o WATER SOURCES VITAL WHEN SELECTING TERRAIN

    o SMFT ENABLES MAXlMUM FLEXIBILITY OF MEDIUM TRUCK
      COMPANIES


¼                                        -


                   LIMITING FACTORS


    0 PURIFICATION TEAMS AND DETACHMENTS REQUIRED TRAINING

    o PROVISlONING OF THE 150K ROWPU WAS INCOMPLETE

    o ROWPU PRODUCTION REDUCED BY HIGH CONCENTRATIONS OF
      DISSOLVED MINERALS (SALT)

    0 DIVISION~S REQUIRED PERSONNEL AUGMENTATION TO OPERATE
      WATER STORAGE SYSTEMS

    0 DELAY~IN PRODUCTION OFTHE 160 GALLON PILLOW TANK AND
      FIVE QUART CARRIER


Document Page: First | Prev | Next | All | Image | This Release | Search