Document Page: First | Prev | Next | All | Image | This Release | Search
File: 970612_dec96_decls12_0002.txt
Subject = MATCS 38 SITREP 25 JAN 91
Parent Organization = MCCDC
Unit = WDID
Folder Title = MASS-3 COMMAND CHRONOLOGY 1-28 FEB 91 SWA 091
Document Number = 23
Box ID = BX600177
[INCLASWIED
Operational summary (by location)
General. Authentication procedures are being utilized. Initial
issue of Peridostigmine and Cypro have been exhausted. )E;PITE No
Detachments 38-B and 28-1 went to MOPP level 4 this week, -ren@ce,-$UC4; D,,tec7to,
additional suits have been requested for these Marines. All f&.-e -racc
detachments are operational in support of Operation Desert Storm.
Shaikh Isa Airbase. MATCS 38 Det B continues to provide 24-hour
Control Tower and Radar Approach Control service to Shaikh Isa.
The TSQ-107 continues to provide strong primary targdts and
coverage.
Jubail KCAF. MATCS 38 Dot C continues to,provide 24-hour Control
Tower, Radar Approach Control and TACAN service to Tubail.
Detachment C continues to perform Mode 2 checks on all aircraft in
it's sector of responsibility. on 24 January, CW03 Thompson began
providing the Helicopter Director and Coordinator function for the
TACC utilizing Dot C's CCS. Early warning from the TACC has been
timely.
King Abdul Az;lz Naval Base. 14ATCS 38 Det E continues to provide
24-hour Control Tower and NAVAID (TACAN, MRAAIS) service to King
Abdul Aziz. Det E Maintenance continues to provide up to 4th
echelon service to Dot C as well its own generators. Det E
received the second Anthrax shot on 24 January.
Ras Al Ghar. MATCS 18, Det B, continues to provide Control Tower
service to MAG 16 helicopters. ATC Tower services ceased at the
Manifa Bay FARP, although the TACAN remains in place. The TRC-195
control tower from the FARP was redeployed to Ras Al Ghar, and
will be manned by five controllers and two co=unications
technicians to provide control tower service, as the remainder of
the Detbe4 moves to Tanajib. This move is scheduled for 27
January.
Ras Al TanaiLb_. MATCS Dot 18 Dot B has deployed a RAIS Team
forward to Tanajib to provide control tower services until the
TSQ-120 Control Tower is emplaced at the site. The TSQ-120 will
be fully operational on 28 January.
Document Page: First | Prev | Next | All | Image | This Release | Search