D. DISCUSSION: INFORMATION FROM AN INPATIENT WHO IS A CBR
INSTRUCTOR STATED THE STAFF SHOULD USE WET SHEET OVER THE
BEDRIDDEN PATIENTS (WATER CAUSES THE GAS TO ROLL OFF TO THE
FLOOR). THE PATIENT SHOULD USE A WET CLOTH OVER THE FACE IN LIEU
OF A MASK. ANOTHER CAUTION IS TO NOT BE TOO QUICK TO PULL OFF
THE MASK AFTER THE "ALL CLEAR" SIGNAL BECAUSE THE (3ASES STILL ARE
PRESENT. THE TENT SHOULD THEN BE OPENED TO ALLOW THE BASES TO
ESCAPE.
C. LESSON LEARNED: STILL NEED FURTHER INFORMATION AND
EDUCATION ON PATIENT CARE IN A CHEMICALLY CONTAMINATED
ENVIRONMENT.
D. RECOMMENDED ACTIONS: COMMAND CBR OFFICER, WITH THE
ASSISTANCE OF PHYSICIANS WHO TOOK THE THREE DAY COURSE, SHOULD
PROVIDE CLASSES ON CARE OF PATIENTS WHILE UNDER CHEMICAL ATTACK
OR IN A CHEMICALLY CONTAMINATED ENVIRONMENT.
E. COMMENTS. NONE
4. WATER LEAKS IN HOSPITAL DURING HEAVY RAINS:
A. OBSERVATION: RECENT HEAVY RAINFALL FOR ALMOST THREE DAYS
RESULTED IN SIGNIFICANT WATER LEAKS THROUGHOUT THE HOSPITAL.
B. DISCUSSION: LEAKING WATER WAS CONFINED PRIMARILY TO THE
TEMPER TENTS ALTHOUGH CONNECTIONS BETWEEN TEMPERS AND ISO
SHELTERS ALSO HAD SOME LEAKS. SITES OF LEAKS, HOWEVER, WERE AT
ALL LEVELS: ROOF, FLOOR AND SIDES. PARTICULAR PROBLEMS WERE
NOTED IN DOUBLE PASSAGEWAY FLOORS WHERE ONE SOLID WOODEN FLOOR
ACROSS BOTH SIDES CASED WATER TO RUN THROUGH BOTH. WHERE SIDES
OF TEMPERS COULD NOT BE SANDBAGGED DOWN, WATER CAME IN UNDER THE
TENTAGE SOAKING THE MATS AND FLOORING. TEMPER TENT OPENINGS FOR
THE AIR/HEAT INLET AND OUTLET DUCTS WERE ADDITIONAL SITE FOR
SIGNIFICANT LEAKS.
RECTED AFTER THE
HARD DECKING WAS CONSTRUCTED, ALL TENT SECTIONS NEEDED TO BE
SECURELY FASTENED AND TIED. THE BOTTOM EDGE OF ALL TEMPER TENTS
NEEDS TO BE TACKED DOWN TO THE WOOD DECKING. OFTEN THERE WAS NOT
ENOUGH TENT MATERIAL TO USE SANDBAGS. PROMISED WOOD STRIPS THAT
COULD BE USED TO TACK DOWN ENDS AND LAG BOLTS TO FASTEN DOWN THE
LOWER EDGE NEVER MATERIALIZED. AIR/HEAT DUCTS NEED TO BE
DESIGNED TO LIFT THEM FROM THE DECK. (THE PULL ON THE SIDES OF
THE TENTS FROM THESE DUCTS CAUSED SOME OF THE LEAKING).
D. RECOMMENDED ACTION: TACK OR BOLT DOWN ALL LOWER EDGES OF
TEMPIER TENTS. REPAIR ALL RENDS AND HOLES IN TEMPERS. INSTALL
ALL DOUBLE PASSAGEWAY DECKS SEPARATELY FOR EACH SIDE SO WATER
DOES NOT FLOW ACROSS. EVALUATE AIR/HEAT DUCT OPENINGS FOR A
METHOD TO PREVENT LEAKS AROUND OPENINGS.
E. COMMENTS: THE RAIN IN SAUDI ARABIA IS ONLY ABOUT FOUR
INCHES PER YEAR AND ONLY DURING DECEMBER - JANUARY YET THE
LEAKAGE PROBLEM WAS SIGNIFICANT. PLANNERS SHOULD CONSIDER THIS
IN MAKING ADJUSTMENTS TO DEPMEDS UNITS DEPLOYED TO DAMPER
CLIMATES.
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 20 f:/Week-36/BX300052/FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837/navgram lessons learned f h f 1 jan 91 to 31 jan:1018961451347
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX300052
Unit = FLEET HOSP
Parent Organization = NAVCENTCOM
Folder Title = FLEET HOSPITAL WORKING PAPERS VARIOUS SOURCES CNA 2837
Folder Seq # = 11
Subject = NAVGRAM LESSONS LEARNED F H F 1 JAN 91 TO 31 JAN
Document Seq # = 58
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-OCT-1996