SUBJECT: Third Tri-Service Task Force (Project Badger)
Meeting @
licensing products produced elsewhere is that they will not
commit themselves without seeing the data. Leverage may be
needed in the future if this becomes a problem. The Executive
Committee decided to cancel the planned meeting in Michigan.
e. (U) The strategy for working with industry is as
follows:
(1) Dr. Johnson-Winegar will draft a Statement of Work
and RFP. With Michigan's agreement, the TDP would be added as an
appendix to the RFP. A draft should be completed by 25 October.
(2) The most likely companies identified in the survey
will be selected. COL McCarty, Commander, USAMRDC, will call the
CEO of each directly, outline the requirements, investment
incentives, etc., and determine if the company is seriously
interested.
(3) Each interested company would be sent an RFP and
would be asked to identify a techn ic point of contact. This
would be followed by visits to inter:lsted companies from USAMRDC
and Michigan technical experts to assess production capability
and related details. it is anticipated that interested companies
would include in their cost estimates the price for replacement
of equipment and/or lost business during production of A.
f. MAJ Balady reported on his discussion with Porton.
Their preproposal is at enclosure 2. COL Lewis commented that
CONUS production is preferable to OCONUS; however, OCONUS
production, particularly in participating countries would be
acceptable.
g. (U) COL Bancroft reported that, at least for production
le candidate. This facility was
discussed in more detail later in the meeting.
h. An additional source was identified by
Dr. Johnson-Wineqar.
This facility is Government Owned-Contractor Operated.
The risks of production of A, normallv produced i
to be nign; nowever, successful fermentation would produce a
large number of doses in a relatively short time. Mrs. Smith
will contact the Contracting Officer for NCI and
3
(2 jg jm H% B-ow
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 5 f:/Week-36/BX003202/THIRD TRI-SERVICE TASK FORCE PROJECT BADGER/third tri-service task force project badger meet:10189613544215
Control Fields 17
File Room = sep96_declassified
File Cabinet = Week-36
Box ID = BX003202
Unit = OTSG
Parent Organization = HSC
Folder Title = THIRD TRI-SERVICE TASK FORCE PROJECT BADGER
Folder Seq # = 3
Subject = THIRD TRI-SERVICE TASK FORCE PROJECT BADGER MEET
Document Seq # = 1
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 18-OCT-1996