Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaaja_01.txt
Page: 01
Total Pages: 2

SUBJECT:   (Message DTG:310900ZAUG90) MAINSTAT (AS OF 2400L 30AUG 90)

PRIORITY							DATE: 243
								TIME:  2201


PAASZYUW  RHIEFDA0118  2431028-   --RHDIBFF.
ZNY
P R  310900Z  AUG  90
FM  37TFW  DEPLOYED//MA//
TO  RHIUFAA/USCENTAF  FWD  HQ   ELEMENT//LGM//
INFO  RHDIAAA/USCENTAF  TAC  LANGLEY  AFB  VA//LG//
RUWTPGA/12AF  BERGSTROM  AFB  TX/LG//
RUWJBLA/37TFW  TONOPAH  TEST  RANGE  NV//MA//
BT


SUBJ:  MAINSTAT  (AS  OF  2400L  30  AUG  90)
THIS  MSG IN TWO PARTS:  PART I  ACFT   STATUS  AND  PART  II  DCM  REMARKS.
1.A.					PROJ  MC
TYPE		AUTH		POSS		MC	NMCS	NMCS	NMCB	24 HRS
F-117A		18		18		11	05	01	01	16
B.	NOT MISSION CAPABLE  STATUS
TYPE		TAIL NO	STATUS	ETIC		REMARKS
F-117A		790		NMCM		1200  31  AUG - RT PLATTY LIGHT
F-117A		791		NMCM		0600  31  AUG - PHASE INSP 2
F-117A		794		NMCS		2400  06  SEP   - LT TAILPIPE LEAK
F-117A		798		NMCM		0400  31  AUG - LEVEL INDICATOR
F-117A		806		NMCB		2400  03  SEP - FUEL TANK LEAK


PAGE  02  RHIEFDA0118
F-117A		808		NMCM		0500  31  AUG - BID OPENED IN FLT
F-117A		848		NMCM		1800   31  AUG - CRKD COMPART CEILING
C.  AVIONICS  EQUIPMENT STATUS  -  NOT  APPLICABLE
D.  ENGINE  STATUS
BASE		TYPE		POSS		MC		ENMCM	ENMCS
37 TFW FWD	F404-GE-F1DZ	    02		02		     0		     0

II.   DCM  COMMENTS
A.   WE  HAVE RECEIVED ONE R-9  REFUELING  VEHICLE  FROM  WRM  STOCKS  IN
THEATER.  THIS VEHICLE IS LEAKING FROM THE VITAULIC COUPLER ON THE
INLET SIDE OF THE FILTER SEPARATOR.  POL  REQUIRES  6 EACH  4  INCH  SLASH
75 VITAULIC COUPLERS  BE SENT TO REPAIR  THIS  AND  ALSO  ADDITIONAL  R-9
REFUELING TRUCKS  ENROUTE  TO THIS  LOCATION.
B.   WE  CURRENTLY  HAVE  28  DAYS OF RAM  AND  6  GAL  OF NAPHA  ON HAND.
WE  ALSO  HAVE  14  DAYS  SUPPLY OF  RAM  MOLDING  ON HAND.  WE  HAVE AN


PRIORITY							PAGE:  1


Document Page: First | Prev | Next | All | Image | This Release | Search