SUBJECT:  CIVIL ENGINEERING/PRIME BEEF

ROUTINE                                                                                                  DATE: 319
                                                                                                                   TIME: 0931



RAASZDKW RHIDFKA0129 3190810-  --RHDIBFF.
ZNY
R 090830Z NOV 90  ZFF-1 IMI ZFF-1
FM 1706 PAREFW//DE//
TO RHIUFAA/HQ USCENTAF FWD ELEMENT//DE//LG
INFO RUCUBBB/HQ SAC OFFUTT AFB NE//SBS/DER/LG//
RHDIAAA/HQ USCENTAF LANGLEY ADB VA//DE/LG//
BT

SUBJECT: ENGINEERING/FIRE PROTECTION/STATUS
1. (U) ENGINEERING
A.  PRIME BEEF:
CURRENT: 54 PLUS 1 WATER/WASTE PERSONNEL FROM HOLLOMAN BARE
BASE OPERATION.
PROJECTED: 6
B.  WATER STATUS:
INSTALLED. WE ARE CURRENTLY DOING BULK CHLORINATION TO MAKE
WATER POTABLE BUT STILL WAITING ON SUPPORT KIT FOR ROWPU.
HAVE TWO SMFTS BUT ONLY ONE 40 FOOT TRAILER.
QTY/DAY LOCAL: BOTTLE DRINKING WATER UNLIMITED
DIST SYS STATUS: INSTALLED
TREATMENT STATUS: INSTALLED-WAITING ON FILTERS AND SUPPORT
KIT.
ROWPU: ONE ON SITE/NOT OPERATIONAL


PAGE 02 RHIDFKA0129
ERD STATUS: NO REQ'D
STORAGE CAPACITY: SIX 20 KGAL BLADDERS ON SITE AND INSTALLED.
SANITARY STATUS:
LOCAL SYS:  NOT AVAILABLE
FIELD SYS:  FOUR FIELD UNITS/ INSTALLED/OPERATIONAL
SHOWER/SHAVE STATUS: 4 INSTALLED/OPERATIONAL
LOCAL SYS AVAIL/QTY: NONE
WASTE MGMT SYS: LAGOON CONSTRUCTED.  DISTRIBUTION SYSTEM
COMPLETE
C.  POWER STATUS: HIGH VOLTAGE SYSTEM IS OPERATIONAL.
POWER PLANT OPERATION 24 HOURS/DAY.
3  GENERATORS OPERATIONAL AT OPS FACILITIES.  INSTALLING HIGH