Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaanl_01.txt
Page: 01
Total Pages: 2

SUBJECT:   MANAGEMENT SUPPORT 

ROUTINE 

RAASZYUW
ZNY
R 221120Z DEC 90 
FM USCENTAF//SC/MO/DP//
TO RHDIAA/HQ TAC LANGLEY AFB VA//BS-SC/XPM/SC/DP//
INFO RHCUABA/HQ AFCC SCOTT AFB IL//EP/XP/CA/DPXX//
RUVOADA/HQ EID TINKER AFB OK//IS/ISX//
RHCCAAA/485EIG GRIFFIS AFB NY//XPB//
RUVKAAA/1827EIS KELLY AFB TX//CC/IS//
BT

SUBJ: ENGINEERING AND INSTALLATION MANAGEMENT SUPPORT (U)
1. 	AN IMMEDIATE NEED HAS BEEN IDENTIFIED FOR A REDUCED 
MANAGEMENT NEED HAS BEEN IDENTIFIED FOR A REDUCED MANAGEMENT CELL TO 
AUGMENT THE SOUTHWEST ASIA ENGINEERING AND  INSTALLATION PROJECT
CENTER IN RIYADH.  THE SCOPE OF E & I WORK HAS INCREASED DRAMATICALLY 
AND REQUIREMENTS HAVE CHANGED IN PRIORITY DRIVEN BY THE NEW FORCE
BUILD UP.  PERSONNEL REQUESTED WILL ASSIST IN MANAGEMENT OF 
REQUIREMENTS THROUGHOUT THE THEATER.
2.	PERSONNEL REQUIREMENTS ARE AS FOLLOWS: 
AFSC		QTY		DRI		DLOC	     ETL 	                ULN
49XX  (CAPT)	   1	          1 JAN 90		UGZY         60 DAYS         TAC 01       



PAGE 2 RHIUFAA3762
361X0  (MSGT)	   1                    1 JAN 90	               UGZY         60 DAYS         TAC 01
VOLUNTEERS FOR THESE POSITIONS ARE ENCOURAGED.  WE PREFER PERSONNEL 
WHO HAVE HAD INSTALLATION  EXPERIENCE AND ARE CURRENTLY SERVING ON A 
MANAGEMENT TEAM.  REQUEST CAPTAIN JON VANDER PYL FROM THE 1827EIS BE
CONSIDERED FOR THE OFFICER POSITION.  HIS QUALIFICATIONS ARE WELL 
SUITED TO OUR NEEDS. 
3. 	(U) ALL DESERT SHIELD DEPLOYMENT CRITERIA SHOULD BE ACCOMPLISHED
(IE-FIELD CONDITIONS, SHOTS, A AND C BAGS, ETC)
4. 	(U) REQUEST EARLY REPORTING. 
5. 	(U) CENTAF/SC POC'S ARE [(b)(2)]	SCX,[(b)(2)] 	AND 
[(b)(2)]			SCX-EI,  	[(b)(2)]

BT
#3762



ROUTINE								PAGE: 1	 	

Document Page: First | Prev | Next | All | Image | This Release | Search