Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaanp_02.txt02 10 PP PP LG281500 (2). (U) THE RESUPPLY RATE IS ESTIMATED TO BE NEARLY 450,000 U.S. GALLONS PER DAY. (3). (U) ON SITE STORAGE TANKS FEED INTO A HYDRANT SYSTEM WITH FOUR OUTLETS AT EACH OF THE 23 COMMERCIAL AIRCRAFT PARKING SPOTS. D. (U) MAJOR CONSTRUCTION ON THE CARGO RAMP INCLUDES A REFUELING HYDRANT SYSTEM WHICH WILL BE OPERATIONAL IN APRIL 1990. E. (U) FUELS SUMMARY: FUEL SUPPLY AND DISPENSING CAPABILITIES ARE CONSIDERED ADEQUATE FOR THE FORCE BEDDOWN CURRENTLY PLANNED. 3. (U) ENGINEERING AND SERVICES: THE INITIAL AIR FORCE POPULATION IS EXPECTED TO BE AROUND 300 PERSONNEL. THESE INDIVIDUALS ARE TO BE BILLETED IN THE EXISTING TENT CITY AT AL MINHAD OR IN A HOTEL/COMPOUND ADJACENT TO THE: AIRPORT COMPLEX. A. (U) RUNWAY DATA: DESIGNATION: OUTSIDE RUNWAY INSIDE RUNWAY 12L 30R 12R 30L LENGTH: 4000M 3805 M 13,123' 12,483' SURFACE TYPE: 46 M 46 M 148' 148' CONDITION: GOOD GOOD SLOPE: LENGTH 1/2% SAME PUBLISHED STRENGTHS: 57,317/185 PSI 83,000/200 PSI CENTERLINE MARKED: YES LIT YES LIT EDGE LIGHTS: YES YES APPROACH LIGHTS: VASI 5 BAR STROBE VASI 5 BAR STROBE ROTATING BEACON: WHITE / WHITE WHITE / WHITE THRESHOLD LIGHT: BI-DIRECTIONAL CENTERLINE W/ RED RUNWAY END LIGHTS VASI LIGHTS: PAPI PAPI WIND INDICATOR: 1 ELECTRIC WIND SOCK: 3 3 WIND TEE: YES SHOULDERS: SURFACE TYPE: ASPHALT ASPHALT WIDTH: 7.5M 7.5 M CONDITION: NEW NEW OVERRUN LENGTH: 60 M 60 M SURFACE TYPE: ASPHALT ASPHALT INSTRUMENT RUNWAY: ILS ILS EMERGENCY POWER: 15 SEC BACKUP ONE ON EACH AIRFIELD SUBSTATION PCN DATA: 70 [(b)(2)]
Document Page: First | Prev | Next | All | Image | This Release | Search