Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaaov_04.txt
Page: 04
Total Pages: 10

PRIORITY						PAGE:  4



PAGE 06 RHIUFNA2583
ACCEPTANCE AND IT APPEARS THAT THE RESURFACING PROJECT FOR ONE OF
OUR DISPERSAL AREAS IS ON TRACK.
B.  MINITIONS.  OUR IMMEDIATE MUNITION PROBLEM HAS BEEN SOLVED WITH
THE LOAN OF A TS 4044/D AIM 9 TESTER.  WE HAVE RECEIVED A POWER
SUPPLY, NSN 4935-01-045-0853 AND AN INFRARED SOURCE, NSN
4935-01-162-7450 FOR OUR TESTER, AND WAIT FOR ITS RETURN FROM RIYADH
FOR MAINTENANCE.  ADDITIONALLY, NINE AIM-9 MISSILES ARE IN CONDITION
CODE  "N", EMERGENCY COMBAT USE ONLY.
C.  EQUIPMENT
(1)  AEROSPACE GROUND EQUIPMENT, OUR AGE FLEET IS HOLDING UP
EXTREMELY WELL, AVERAGING ABOVE 94  PERCENT.  HOWEVER, TWO ARE BELOW
CRITICAL LEVELS FOR THE FOLLOWING PARTS:
      MCIA COMP  	REGULATOR 	4820-00-404-5866   FB48443389114
      MC7 COMP	REGULATOR		4820-01-230-3694    FB28233414028
ADDITIONALLY, TWO MC1A DIESEL AIR COMPRESSORS ARE REQUIRED.  ONE
COMPRESSOR IS NEEDED FOR THE FIRE DEPARTMENT AND THE SECOND
COMPRESSOR IS NEEDED AS A BACKUP FOR MUNITIONS.
(2) X-RAY CAPABILITIES.   WE ARE WITHOUT X-RAY CAPABILITY AGAIN.
THIS TIME THE TUBE HEAD ON OUR SPERRY KVP-160 IS DEFECTIVE.  OUR
MESSAGE 140525Z DEC 90 TO USCENTAF/LGM PROVIDES FULL DETAILS.  WE
BT
#2583
NNNN







PRIORITY							PAGE:  4

Document Page: First | Prev | Next | All | Image | This Release | Search