Document Page: First | Prev | Next | All | Image | This Release | Search
File: aaavg_01.txtSUBJECT: CIVIL ENGINEERING/PRIME BEEF ROUTINE DATE: TIME: RAASZYUW RHIDFKA0254 3201650- --RHDIBFF. ZNY R 162200Z NOV 90 FM 1706 PAREFW//DE// T0 RHIUFAA/HQ USCENTAF FWD//DE/LG// INFO RUCUBBB/HQ SAC OFFUTT AFB NE//SBS/DER/LG// RHDIAAA/HQ USCENTAF LANGLEY AFB VA//DE/LG// BT SUBJECT: ENGINEERING/FIRE PROTECTION/STATUS 1. (U) ENGINEERING A. PRIME BEEF: CURRENT: 54 PERSONNEL PROJECTED: 6 B. WATER STATUS: INSTALLED. WE ARE CURRENTLY DOING BULK CLORINATION T WATER POTABLE BUT STILL WAITING ON SUPPORT KIT FOR R HAVE TWO SMFTS BUT ONLY 0NE 40 FOOT TRAILER. QTY/DAY LOCAL: BOTTLE DRINKING WATER UNLIMITED DIST SYS STATUS: INSTALLED TREATMET STATUS: INSTALLED-WAITING ON FILTERS AND SUPPORT KIT. PAGE 02 RHIDFKA0254 ROWPU: ONE ON SITE/NOT OPERATIONAL ERD STATUS: NOT REQ'D STORAGE CAPACITY: SIX 20 KGAL BLADDERS ON SITE AND INSTALLED. SANITARY STATUS: LOCAL SYS: NOT AVAILABLE FIELD SYS: FOUR FIELD UNITS/INSTALLED/OPERATIONAL SHOWER/SHAVE STATUS: 4 INSTALLET/OPERATIONAL LOCAL SYS AVAIL/QTY: NONE WASTE MGMT SYS: LAGOON CONSTRUCTED. DISTRIBUTION SYSTEM COMPLETE. C. POWER STATUS: HIGH VOTAGE SYSTEM IS OPERATIONAL. POWER PLANT OPERATION 24 HOURS/DAY. 3 GENERATORS OPERATIONAL AT OPS FACILITIES. INSTALLING HIGH ROUTINE PAGE: 1
Document Page: First | Prev | Next | All | Image | This Release | Search