File: aaafa_02.txtROUTINE PAGE: 2 POWER PLANT OPERATION 24 HOURS/DAY. 3 GENERATORS OPERATIONAL AT OPS FACILITIES. INSTALLING HIGH VOLTAGE LINES TO OPS FACILITIES. COMMERCIAL AVAIL/CAP: NONE DISTRIBUTION SYS CAP: INSTALLED/OPERATIONAL. GENERATOR QTY/CAP: 3-5 KW, 8 EA 60 KW, 11 EA 100 KW, 3 EA PAGE 3 RHIDFKA0102 750 KW. WE CAN RETURN 100 KWS FOR USE AT OTHER LOCATIONS. D. ATH HOSP STATUS: ONE CLINIC ERECTED. ALSO ONE TENT HAS BEEN ERECTED AS A WARD. AIR TRANSPORTABLE HOSPITAL (ATH) NOT ON STATION. E. (U) VEHICLE STATUS: 3 USAF 4X4 P.U. IN USE AND LOCAL RENTAL OF 8 GENERAL PURPOSE VEHICLES. LOCAL RENTAL OF HEAVY EQUIPMENT TERMINATED TODAY. USAF VEHICLES: 2 EA 13 TON AT FORKLIFTS, 2 EA SEWER PUMPING TRAILERS, 1 EA D-7 DOZER, 2 EA 10 TRACTOR, 1 EA 40 FOOT TRAILER, 1 EA TILT TRAILER, 3 EA FLIGHTLINE SWEEPERS. F. RRR CAPABILITY: NONE. MATTING BEING USED IN GP SHELTERS AS FLOORING. 3 BUNDLES LEFT. G. AIRFIELD STATUS: PAVE COND/CAP: LCN 75 BARRIERS: 2 BAK 12'S 2 BAK 14'S NAV AIDS: RUNWAY AND MAIN TAXI LIGHTS EXIST BUT ARE MARGINAL FOR NIGHT OPERATION. APPROACH AND THRESHOLD LIGHTS INSTALLED. PLASI OPERATIONAL. USAF PORTABLE TACAN IS OPERATIONAL. INSTRUMENT LANDING SYSTEM HAS BEEN FLIGHT CHECKED AND IS OPERATIONAL. H. (U) TENT CITY STATUS: UNCHANGED EXCEPT THIRD GP SHELTER ERECTED PAGE 4 RHIDFKA0102 AS WEIGHT LIFTING FACILITY. ALL TENTS/SHELTERS ARE ERECTED 1. SHORTFALLS: (1) SUPPORT KIT FOR ROWPU. (2) 40 FOOT TRAILER FOR WATER RESUPPLY OPERATIONS AND ONE SMFTS TO REPLACE THE ONE WHICH BLEW A SEAM LONG TERM IS TWO 5,000 TANKERS TRUCK. ROUTINE PAGE: 2
Document Page: First | Prev | Next | All | Image | This Release | Search