Document Page: First | Prev | Next | All | Image | This Release | Search

File: aaafg_03.txt
Page: 03
Total Pages: 7

PRIORITY 									PAGE: 3




RRR SET, NEED TO IDENTIFY MATERIAL FROM THE LOCAL ECONOMY TO REPAIR
 THEIR RUNWAY.
		(5)   (U)  THE POL SYSTEM IF THE LIFELINE TO YOU SITE'S
 MISSION.  IT IS TIME TO CONSIDER CONSTRUCTION OF PROTECTIVE BERMS TO
 PROTECT THIS ASSET.
	B.    (U)  SITE LAYOUT
	            (1)  AVAILABLE REAL ESTATE WILL DRIVE THE DISPERSAL OF 
YOUR HARVEST FALCON TENTAGE AND UTILITY ASSISTS.  THE HARVEST FALCON ELECTRICAL EQUIPMENT IS EVEN DESIGNED TO IDEALLY FORCE YOU TO
 DISPERSE YOUR TENTAGE ASSETS (I.E. THE ONLY WAY YOU CAN CONNECT 16 
TENTS TO A SECONDARY DISTRIBUTION CENTER USING THE 50 AND 100 FOOT
CABLES IS TO ARRANGE THEM IN A CONCENTRIC CIRCLE ARRANGEMENT AROUND
THE SDC.)   TENTS CAN BE ARRANGED IN RECTANGULAR BLOCKS OF 14 IF REAL 
ESTATE IS LIMITED BUT AVOID THIS ESPECIALLY IN HIGH THREAT LOCATIONS.
	         (2)       (U)  HOPEFULLY YOU HAVE PICKED A SITE WITH GOOD
DRAINAGE.  CHECK WITH YOUR WEATHER OFFICE AND YOU MAY BE SURPRISED TO
LEARN JUST HOW MUCH RAIN TO EXPECT AND IN WHAT MONTHS TO EXPECT IT.
NOTE THAT PLACES WHERE RAINSTORMS OCCUR, THE RAIN HAS BEEN KNOWN TO
COME QUICKLY AND OVER A SHORT PERIOD OF TIME.  WITH LIMITED



PAGE 5 RHIUFAA2013
VEGETATION,  RUNOFF CAN FLOOD LOW LYING AREAS QUICKLY.  ALSO, THE SOIL
WITHIN THE AOR TENDS TO BE IMPERMEABLE TO LARGE AMOUNTS OF WATER.  
THIS RESULTS IN LARGE POOL OF STANDING WATER, WHICH MAY PERSIST FOR
ONE TO TWO WEEKS.
           C.       (U)  UTILITIES

                        (1)             ELECTRICAL POWER, IS AS YOU ARE WELL AWARE, A

CRITICAL ASSET AND IN SHORT SUPPLY.  PRESENTLY WE DO NOT HAVE
SUFFICIENT ASSETS TO EVEN MEET THE CURRENT ELECTRICAL POWER DEMAND AT
MOST OF THE SITES, MUCH LESS THE GROWTH REQUIREMENTS.  IT WOULD BE
IDEAL TO RUN THE BARE BASE CAMPS OFF HOST NATION POWER AND RESERVE
YOUR GENERATOR ASSETS FOR CONTINGENCY SITUATIONS.  THE INITIAL (30
DAY) WAR READINESS SPARE KITS FINALLY ARRIVED IN THEATER AND ARE
PRESENTLY POSITIONED WITH THE MAIN GENERATOR REPAIR DEPOT AT
THUMRAIT, OMAN.  UNFORTUNATELY THE GENERATOR REPAIR PARTS, WHEN
SHIPPED FROM THE STATES, WERE NOT PACKAGED AS KITS.  THIS WILL CAUSE







PRIORITY									PAGE: 3  




Document Page: First | Prev | Next | All | Image | This Release | Search