Document Page: First | Prev | Next | All | Image | This Release | Search

File: aabaw_04.txt
Page: 04
Total Pages: 7

	c By 5 Jan 91, base wide training should begin to include (ACTION:
CVI)

		(1) CPX for battle staff/SRC/control centers only.

		(2) Attack response training for entire base and our hosts on: alarm system 
notifications and individual actions; damage assessment procedures; spot decon of aircraft, 
aircrews, vehicles; casualty decon operations; fire response, casualty reporting and 
self-aid/buddy care; mask drill: CCD actions.

	d. Base Grid Maps: Required for each control center. (ACTION: DE, ECD: 30 DEC).

	e. Updated phone listing is needed. (ACTION: SC, ECD: 30 DEC).

6. The next meeting will be 23 Dec, 0930 in the Base Conference Room.

[(b)(6)]
JENNY L. ARTERY, Major, USAF
Chief, Air Base Operability

Approved.

[(b)(6)]
MICHAEL NAVARRO						2 Atch
Colonel, USAF						1. Agenda
Commander, 388 TFW (Deployed)				2. ABO Project List, 11 Dec 90





Document Page: First | Prev | Next | All | Image | This Release | Search