Document Page: First | Prev | Next | All | Image | This Release | Search
File: aabaw_04.txtc By 5 Jan 91, base wide training should begin to include (ACTION: CVI) (1) CPX for battle staff/SRC/control centers only. (2) Attack response training for entire base and our hosts on: alarm system notifications and individual actions; damage assessment procedures; spot decon of aircraft, aircrews, vehicles; casualty decon operations; fire response, casualty reporting and self-aid/buddy care; mask drill: CCD actions. d. Base Grid Maps: Required for each control center. (ACTION: DE, ECD: 30 DEC). e. Updated phone listing is needed. (ACTION: SC, ECD: 30 DEC). 6. The next meeting will be 23 Dec, 0930 in the Base Conference Room. [(b)(6)] JENNY L. ARTERY, Major, USAF Chief, Air Base Operability Approved. [(b)(6)] MICHAEL NAVARRO 2 Atch Colonel, USAF 1. Agenda Commander, 388 TFW (Deployed) 2. ABO Project List, 11 Dec 90
Document Page: First | Prev | Next | All | Image | This Release | Search