PAGE 05 RHIEFKA0794 
JUSTIFICATION AS PREVIOSLY SUBMITTED, [(b)(1)sec 3.4(b)(5)]
						TENTS AND FIELD UNITS WILL BE
UNSUPPORTABLE BEFORE PERMANENT FACILITTES ARE BUILT UNLESS STARTED
SOON.  REQUIREMENT: PERMANENT DINING FACILITY/JUSTIFICATION: AS
ABOVE FOR SHOWER/SHAVE/LATRINE FACLITIES. REQUIREMENT: COMMERCIAL
LAUNDRY FACILITY/JUSTIFICATION: FIELD LAUNDRY USE FOR EXTENDED
PERIODS IS NOT DESIRABLE. LIMITATION ON USE FOR PERSONAL CLOTHING
PLUS RESTRICTIONS ON OFF-BASE LAUNDRY USE FOR U.S. IDENTIFIABLE
CLOTHING MAKE ALTERNATE LAUNDRY NECESSARY. HAND WASHING IS NOT SUIT-
ABLE ANSWER FOR LONG TERM. MINIMUM REQUIREMENT IS LIMITED U-WASH-IT
COMMERCIAL GRADE WASHERS AND DRYERS. REQUIREMENT: NONPOTABLE WATER
SUPPLY/JUSTIFICATION: NONPOTABLE WATER FOR SHOWERS, LATRINES, AND
LAUNDRY IS CURRENTLY TRUCKED TO CAMP BY CONTRACT.  SUITABLE NONPOT-
ABLE WATER SOURCE IS LESS THAN A MILE AWAY AND COULD BE PIPED TO CAMP
INVESTMENT WELL WORTH IT FOR LONG TERM PRESENCE HERE. REQUIREMENT:
SEWAGE HOLDING TANK/JUSTIFICATION: SEWAGE IS CURRENTLY PUMPED FROM
HF LATRINES BY CONTRACT. TRUCKS MUST OPERATE IN CONGESTED AREA AND
UNPLEASANT ODOR IS UNAVOIDABLE IN CAMP. FOR SANITARY REASONS, REMOTE
TANK CONNECTED BY PIPING IS NECESSARY T0 IMPROVE SANITATION. TANK

PAGE06 RHIEFKA0794 
COULD BE USED FOR PERMANENT LATRINE FACILITIES AS WELL. REQUIREMENT:
ELECTRICAL TIE-IN TO BASE PONER PLANT/JUSTIFICATION:[(b)(1)sec 3.4(b)(5)]
                         SITS UNUSED OPPOSITE TENT CITY. PLANT TIED IN TO BASE
POWER GRID BUT IS NOT NEEDED. WITH APPROPRIATE CONVERSION AND
DISTRIBUTION PLANT COULD SUPPLY TENT CITY AND ALLOW 750 KW GENERA-
TORS TO ACT AS BACK UP VICE PRIMARY POWER SYSTEM.  ANTICIPATED
REQUIREMENT:  PARKING APRON/TAXIWAY FOR MUNITIONS UPLOAD OF CARGO
ACFT/JUSTIFICATION:  INITIAL REQUEST TO CE IS FOR AM-2 MATTING FOR
[(b)(1)sec 3.4(b)(5)]
                                                                                                 LAYOUT AND DETAILED
REQUIREMENTS ARE BEING DEVELOPED MORE TO FOLLOW.

BT
#0794



NNNN         