SUBJECT:  CENTAF/DE INFORMAL SURVEY OF PROPOSED TENT CITY SITE.

COLONEL PETTINGOHN				22 AUG 90

SIR

LOOKED OVER THE "TENT CITY" SITE.  THESE ARE OUR
COMMENTS AS WE SEE IT TONIGHT.

1.  DRAINAGE DITCH OTHER SIDE OF HARDTOP ROAD.
    --CONCERNED WITH WATER STAGNATION (FROM SHOWERS, WASHING)
    --WATER BACKUP AND POTENTIAL HEALTH PROBLEMS.

2.  PARKING IS INADEQUATE AND ROAD SYSTEM WILL BE CONGESTED.

	[(b)(1)sec3.4(b)(6)]

4.  WILL NEED CONTRACT SEWAGE PICKUP AND REFUGE DISPOSAL.

5.  SITE WILL ACCOMMODATE:
    --154 SLEEPING TENTS (1540 PEOPLE)
    --NO ROOM FOR SHOWERS, LATRINES OR DINING FACILITY.
    --REDUCTIONS TO ACCOMMODATE ABOVE, REDUCES NUMBER OF SLEEPING TENTS.
    --ASSUMES ELECTRICAL POWER FROM SUB-STATION ACROSS THE ROAD.
      OTHERWISE GENERATORS WILL FURTHER REDUCE THE NUMBER OF 
      SLEEPING TENTS.

OTHER CONCERNS:

1.  TYPES OF TENTS AND SUPPORT EQUIPMENT IS UNKNOWN, WHICH
    IMPACTS OUR ABILITY TO ESTIMATE ERECTION TIME.  THIS COULD 
    TAKE ANY TIME FROM A FEW DAYS TO OVER A WEEK.

2.  CURRENT SITE IS INADEQUATE FOR THE NUMBER OF FORCES; WHICH
    LEADS TO MULTIPLE SITES; WHICH FURTHER LEADS TO ADDITIONAL
    EQUIPMENT REQUIREMENTS.