Document Page: First | Prev | Next | All | Image | This Release | Search
File: aabef_02.txt3553 NMC BOOM HOIST VALVE LEAK. BOOM FUEL BYPASS VALVE LEAK. LANDING LIGHT ASSEMBLY BROKEN. 4835 FMC FIXED B. LOGISTICS SUPPORT CONTINUES TO FALL IN PLACE. WE HAVE A SOURCE FOR GASEOUS OXYGEN, LIQUID OXYGEN, AND WE ARE WORKING FUEL RESUPPLY. THE FIRST INCREMENT OF THE WRSK IS ON HAND AND IS BEING INVENTORIED. C. THE MMS OPERATION IS BEING HAMPERED BY THE LACK OF CHAINS AND LOAD BINDERS. REQUEST ASSISTANCE IN GETTING CHAINS AND LOAD BINDERS RETURNED FROM DELIVERY DESTINATIONS. D. WE WILL GIVE IMMEDIATE ATTENTION TO CHECKING THE WRSK FOR THOSE ITEMS WE HAVE ORDERED MICAP. E. THE FOLLOWING ARE CURRENT SUPPLY REQUIREMENTS: (1). NOMENCLATURE: ANTENNA. END ITEM: KC-135R. MISSION IM- PACT: [(b)(l)sec3.4 (b)(5)] (2). NOMENCLATURE: HOSE ASSEMBLY. END ITEM: MC-1A AIR COMPRES- SOR. MISSION IMPACT: [(b)(l)sec3.4 (b)(5)] (3). NOMENCLATURE: RECEPTION COUPLING. END ITEM: KC-135R. MISSION IMPACT: [(b)(l)sec3.4 (b)(5)] (4) NOMENCLATURE: BRAKE. END ITEM: KC-135R. MISSION IMPACT: IF TEMPORARY FIX FAILS, AIRCRAFT WILL BE GROUNDED, NMCS. (5) NOMENCLATURE: VALVE, BOOST HOIST. END ITEM: KC-135R. MISSION IMPACT: [(b)(1)sec 3.4(b)(5)] (6). NOMENCLATURE: VALVE, FUEL BYPASS. END ITEM: KC-135R. MISSION IMPACT: [(b)(l)sec3.4 (b)(5)] ( 7) NOMENCLATURE: SEAL. END ITEM: KC-135R. MISSION IMPACT: [(b)(l)sec3.4 (b)(5)] ( a ) NOMENCLATURE: LENS, RETAINING RING, END ITEM: KC-135R.
Document Page: First | Prev | Next | All | Image | This Release | Search