Document Page: First | Prev | Next | All | Image | This Release | Search

File: aabef_02.txt
Page: 02
Total Pages: 4

3553		NMC 		BOOM HOIST VALVE LEAK. BOOM FUEL BYPASS VALVE
				LEAK. LANDING LIGHT ASSEMBLY BROKEN.
4835		FMC 		FIXED
B.	LOGISTICS SUPPORT CONTINUES TO FALL IN PLACE. WE HAVE A
SOURCE FOR GASEOUS OXYGEN, LIQUID OXYGEN, AND WE ARE WORKING FUEL
RESUPPLY. THE FIRST INCREMENT OF THE WRSK IS ON HAND AND IS
BEING INVENTORIED.
C. 	THE MMS OPERATION IS BEING HAMPERED BY THE LACK OF CHAINS
AND LOAD BINDERS. REQUEST ASSISTANCE IN GETTING CHAINS AND LOAD
BINDERS RETURNED FROM DELIVERY DESTINATIONS.
D. 	WE WILL GIVE IMMEDIATE ATTENTION TO CHECKING THE WRSK
FOR THOSE ITEMS WE HAVE ORDERED MICAP.
E. THE FOLLOWING ARE CURRENT SUPPLY REQUIREMENTS:
(1). NOMENCLATURE: ANTENNA. END ITEM: KC-135R. MISSION IM-
PACT: [(b)(l)sec3.4 (b)(5)]
(2). NOMENCLATURE: HOSE ASSEMBLY. END ITEM: MC-1A AIR COMPRES-
SOR. MISSION IMPACT: [(b)(l)sec3.4 (b)(5)] 
(3). NOMENCLATURE: RECEPTION COUPLING. END ITEM: KC-135R.
MISSION IMPACT: [(b)(l)sec3.4 (b)(5)] 
(4)  NOMENCLATURE: BRAKE. END ITEM: KC-135R. MISSION IMPACT:
IF TEMPORARY FIX FAILS, AIRCRAFT WILL BE GROUNDED, NMCS.
(5)  NOMENCLATURE: VALVE, BOOST HOIST. END ITEM: KC-135R.
MISSION IMPACT: [(b)(1)sec 3.4(b)(5)] 
(6). NOMENCLATURE: VALVE, FUEL BYPASS. END ITEM: KC-135R.
MISSION IMPACT: [(b)(l)sec3.4 (b)(5)]
( 7) NOMENCLATURE: SEAL. END ITEM: KC-135R. MISSION IMPACT:
[(b)(l)sec3.4 (b)(5)]
( a ) NOMENCLATURE: LENS,  RETAINING RING, END ITEM: KC-135R.


Document Page: First | Prev | Next | All | Image | This Release | Search