MISSION IMPACT: AIRCRAFT GROUNDED, NMCS. 
 4. 	COMBAT SUPPORT. 
 A.	 CAMP STATUS. CAMP SET-UP IS PROGRESSING WITH THE ONLY 
DRAWBACK BEING THE LACK OF SOME KEY SUPPLIES. TO REACH OUR TASK 
[(b)(l)sec3.4 (b)(5)]	WE NEED THIRTY FIVE POWER DISTRIBUTION PANELS 
(PDPS), TWO SECONDARY DISTRIBUTION CENTERS (SDCS), AND FOUR 
TENTS. THIS IS NOW CRITICAL SINCE OUR POPULATION COULD GROW TO 
[(b)(l)sec3.4 (b)(5)]IN THE NEAR FUTURE. ADDITIONAL MATERIALS WILL BE 
REQUIRED IF WE [(b)(l)sec3.4 (b)(5)] IF THERE ARE ANY 415 VOLT (3 PHASE) 
TO 220 VOLT (3 PHASE) TRANSFORMERS AVAILABLE WE COULD POWER THE 
CAMP FROM COMMERCIAL SOURCES. 
B. 	PERSONNEL. CAMP POPULATION IS NOW 531 OF WHICH TWENTY 
FOUR ARE FEMALE. WE ARE CURRENTLY ASSESSING PERSONNEL ASSIGNED 
TO DETERMINE ANY OVERAGES. WILL PASS INFORMATION WHEN ASSESSMENT 
IS COMPLETE. 
C. 	WE STILL HAVE NOT RECEIVED WORD ON THE STATUS OF THE 
ENTOMOLOGIST AND ASSOCIATED EQUIPMENT AND CHEMICALS REQUESTED 
PREVIOUSLY. WE COULD EXPERIENCE A SERIOUS HEALTH PROBLEM, NOT TO 
MENTION MORALE, IF WE CANNOT COMBAT THE ONSLAUGHT OF FLIES AND 
MOSQUITOS EXPECTED SHORTLY. ALSO NEED A BIOENVIRONMENTAL ENGI- 
NEER TO CHECK OUR WATER SUPPLY. 
5 	COMMANDER'S ASSESSMENT. WE HAVE BEGUN WORKING ISSUES 
RELATED TO BASING 10 KC-10 AIRCRAFT THIS LOCATION. A PRELIMINARY 
PARKING PLAN WILL BE COMPLETED ON 3 SEP. MY MAJOR CONCERN IS 
[(b)(1)sec3.4 (b)(5)] 
 
 										I
WILL TRY TO DETERMINE REFUELING CAPABILITY ON SEEB SOUTH ON 3 