Document Page: First | Prev | Next | All | Image | This Release | Search
File: aabes_01.txtSUBJECT: 17 AIR DIVISION (P) POINT PAPER ON SEEB TANKER BASING - LOGISTICS POINT PAPER ON SEEB TANKER BASING - LOGISTICS ALL OTHER PORTIONS OF THIS DOCUMENT EXEMPTED [(b)(l)sec 3.4(b)(1)]' -- (U) A water distribution partially installed by contract and by the Prime Beef team. --- (U) Several hundred feet of water pipe purchased locally. --- (U) The system was installed underground by local contractors. --- (U) The water supply tank which services the camp must be replenished more frequently and monitored much closer because of our presence. --- (U) A clorination system was installed in the system to satisfy our environmental health requirements. -- (U) A sewage collection system installed by the unit civil engineers. --- (U) Four 6000 gallon capacity tanks were procured and installed to collect waste water and sewage. --- (U) Each of the latrines and shower units are connected to the collection tanks via underground pipe which we installed.
Document Page: First | Prev | Next | All | Image | This Release | Search