Document Page: First | Prev | Next | All | Image | This Release | Search

File: 060596_apr_decls1_0001.txt
Page: 0001
Total Pages: 8

Subject: APPENDIX 6 TO ANNEX C TO 503D MP BATTALION READINESS SOP        

Box ID: BX000047

Unit: XVIII CORPS 

Parent  Organization: ARCENT      

Folder Title: CALL OUT CHECKLIST  NBC                                                                         

Folder Seq #:         29

Document Number:          2

Document Date: 

Scan Date: 24-APR-1996






             AppENDIX 6 (NBC) TO ANNEX C (OPERATIONS) TO 503d Military Police Battalion
             Readinss SOP

                                  following checklist outlines the minimum requirements for
                  Purpose:   The
                 aration for movement, organization, and equipment for nuclear,    bialiogical,
             prep
             and chemical operations during a deployment exercise.

             Z. Preparation for Movement.                                  YES    NO   P914ARKS

                a.   NBC Supplies.

                     1. Were DA Form 2765-i's completed prior to
                     the EDRE?

                     2. Did the unit order the following
                     contingency supplies on the DA Form 2765-1?

                          a. CPOG (by size) (one per individual)

                          b. CP Footwear covers (one per individual)

                          c. CP Gloves (by size) (one per individual)

                          d. Batteries, BA 3517/u
                 O@,      e. Refill.Kit %229 (two per alarm)

                          f. Mark I Kits (three per individual)

                          g. Did the unit request shortage equipment
                          from the supporting unit?

                b.   Load Plans.

                     1. Does the unit have load plans for NBC
                     and control party equipment?

                     2. Does each section have a plan for
                     loading once a tactical configuration is
                     achieved and the NBC equipment is distributed?

                     3. Are the load plans included in the unit
                     FSOP?

                     4. Did the unit load the equipment'IAW
                     the load plan?

                     5. Are STB and DS-2 loaded so as not
                     to spill and intermingle?

                     6. Does the load plan include contingency
                     stocks?


atus




                                                    C-6-1

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 8 f:/Week-15/BX000047/CALL OUT CHECKLIST NBC/appendix 6 to annex c to 503d mp battalion readi:05309618571731
Control Fields 17
File Room = apr96_declassified
File Cabinet = Week-15
Box ID = BX000047
Unit = XVIII CORPS
Parent Organization = ARCENT
Folder Title = CALL OUT CHECKLIST NBC
Folder Seq # = 29
Subject = APPENDIX 6 TO ANNEX C TO 503D MP BATTALION READINESS SOP
Document Seq # = 2
Document Date = 01-JAN-1980
Scan Date = 24-APR-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 30-MAY-1996