  FROM: 82nd Ener Bn
  TO: 7 Eagr Bde

  SUBJECT: ENGREP/82nd Engr Bn/As of 170800 JAN 1991

  PART I,. Commander's Assessment

    A. Present: Carrying out the Battalion trainine plan concentrating
  on vehicle and equipment maintenance.

    B. Next 24 - 48 Hours: Preparing for future operations.

    C. Concernst We are still waiting answers on our Previous
  concerns. Last night we were told to beein taking MAIP tablets two
  and one half hours late. We were monitoring the Brigade not. We
  cannot afford to have something like this happen aeain. The Brizade
  RETRANS must be deployed to solve the problem. The.guidance to take
  the PB tablets was issued without identifying the NBC threat nor was
  the NBC threatcon level changed. When will receive the order to stop
  -takine the HAAP tablets?

  Part 2: Unit Status

    A. Unit Location: 28 deg 08 &in N long, 47 deg 14       min E lat

    B. Unit Status (Rollup of Equipment):

                                                  Current   Next 24 Hrs Commit.
       1) CDRs Assessment (red. amber, green)     green     green
       2) Effective PLTz/Authorized PLTs          12/12     12/12
       3) Dozers                                  13/13     13/13       2
       4) Loaders                                 8/8       8/8
       5) Tractors wl Trailers                    13/15     13/15       a
       61 Graders                                 3/4       3/4
       7) Water Distributors                      1/1       1/1
       8) ConDaction Equipment                    N/A       X/A
       9) 5 ton Dumps                             38/38     38/38
      10) M113s                                   51/52     51/52
      11) HICLIC Trailers                         11/12     11/12
      12) HICLIC Reloads                          0         0     (need rockets)
      13) GEMSS                                   4/4       4/4
           0         0
      15) Fixed Bridge                            NIA       N/A
      16) Class IV (red, amber, green)            amber     amber
      17) Class V (red, amber, green)             red       red
      Is) SEE                                     12/12     12/12





                                        DECLASSIFIED ON 10 Jul 1996 PER SEC A           MH
                                        UNDER SEC 3.4 EO 12958
                                            UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 2 f:/Week-24/BX000211/SITUATION REPORTS 82D ENG BN 23 DEC 90- 5 APR 91/engrep 82nd engr bn 17 jan 91:07129615530371
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000211
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 82D ENG BN 23 DEC 90- 5 APR 91
Folder Seq # = 6
Subject = ENGREP 82ND ENGR BN 17 JAN 91
Document Seq # = 71
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 12-JUL-1996