Document Page: First | Prev | Next | All | Image | This Release | Search

File: 072496_jul96_decls10_0002.txt
Page: 0002
Total Pages: 4

Subject: NBC SUPPORT DURING PHASE III                                    

Unit: 1ST ID      

Parent  Organization: VII  CORPS  

Box ID: BX001043

Folder Seq #:         72

Document Number:         53



                                                       UNCLASSIFIED

             the breach site. Decontamination of returning vehicles will be
             conducted on MSR SCHOFIELD and MSR BERRY south of the breach
             site.


                             (2) (S) Smoke. Smoke operations will support
             screening, PSYOP and deception operations conducted ICW 2nd
             Brigade.

                             (3) ES; Chemical recon. FOX NBC recon vehicles
             will support the Crossing Force Command during breaching and
             crossing operations. Primary effort is to providing Technical
             Intelligence Collection by means of spectrum analysis tapes and
             environmental samples. Priority of effort -For the FOX recon
             vehicles supporting the Crossing Area Commands is to finding
             contamination-free areas.


                     b. (U) Tasks to subordinate units.

                             (1) (S) lst Brigade. One FOX rec:on squad supports
             CAC, priority to finding contamination--FreL- areas in Lanes A thru
             H. Provide and establish hasty decon site ALPHA vic NT685465
             using organic and DS assets. Conduct hasty decon for passing
             units at decon site ALPHA. Release smoke platoon NLT conclusion
             of PHASE III to 2nd Chem Bn.


                             (2) @ 2nd Brigade. One FOX recon squad supports
             CAC, priority to finding contamination-+ree areas in Lanes I thru
             P. Provide ind establish hasty decon site BETA vic NTS45415
             using organic and DS assets. Conduct hasty decon for passing
             units at decon site BETA. Release smoke platoon NLT conclusion of
             PHASE III to 2nd Chem Bn.


                             (3) fS) 3rd Brigade. Provide and establish hasty
             decon site IRON via NTS004SO using organic and DS assets. Conduct
             hasty decon for passing units at decon site IRON. Release smoke
            platoon NLT conclusion of PHASE III to 2nd Chem Bn.

                             (4) ES) DISCOM. Provide and transport 9,000
             gallons water (potable or non-potable) to decon site HOSE vic
             NT500175, and 9,000 gallons water to decon site STUMP vic
             NTS20120, NLT G-2. Provide and transport 6,000 gallons water to
             decon site DRAGON vic NTS50460, NLT Division H@IS hours. Be
             prepared to transport I'@2 barrels fog oil to 2nd Chem Bn at decon
             site DRAGON NLT Division H+18 hours. Direct coordination with 2nd
             Chem Bn authorized.


                             (5) @ 176 Engineer (3roup. Prepare hasty dl-con
             sites at HOSE vic NT500175, and STUMP vic NTB201'40, ICW 2nd Chem
             Bn an G-2. Prepare hasty decon site at DRAGON vic NT850460 XCW
             2nd Chem Bn NLT Division H+12 hours. Provide road marking signs
             identifying decon sites on MSR SCHOFIELD and MSR BERRY to 2nd
             Chem Bn NLT G-DAY. Direct coordination with 2nd Chem Bn
             authorized.




                                                               Regraded bll;CLASSIFIED
                                     UNCLASSI@                 NP For      20-1
                                                               Hy
                                                               G.3/1)Ft - OFS

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 4 f:/Week-27/BX001043/frago orders to opor scorpion danger dst-storm 91/nbc support during phase iii:07199611264010
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-27
Box ID = BX001043
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = frago orders to opor scorpion danger dst-storm 91
Folder Seq # = 72
Subject = NBC SUPPORT DURING PHASE III
Document Seq # = 10
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 19-JUL-1996