Document Page: First | Prev | Next | All | Image | This Release | Search
File: 072496_jul96_decls10_0003.txt
Subject: NBC SUPPORT DURING PHASE III
Unit: 1ST ID
Parent Organization: VII CORPS
Box ID: BX001043
Folder Seq #: 72
Document Number: 53
UNCLASSIFIED
(6) (5) DIVARTY. Be prepared to receive 12th Chem
Co and 3'43rd Chem Co (-) at the conclusion of PHASE III to
support divisional deliberate decon operations during refit and
reconstitution.
(7) (9) 4-nd Chem Bn. Coordinate preparation and
layout of decon sites HOSE vic NT500175, and STUMP vic NT820120
with 176 Eng Group and 181 Chem Co. Provide quartering parties at
decon sites HOSE and STUMP NLT B-3. Coordinate engineer
operations and water drop at HOSE and STUMP on B-2. Mark routes
to decon sites ALPHA, BETA, IRON, DRAGON, HOSE and STUMP. Conduct
FOX NBC recon for the Crossing Force Command starting G-DAY,
priority to verifying use of chemical agents by IRA12. Occupy and
be prepared to operate decon sites HOSE and STUMP NLT G-DAY. NLT
Division H+B hours, be prepared to conduct smoke operations north
of the breach ICW 2nd Brigade. NLT Division H+12 hours, establish
and operate decon site DRAGON vic NTS50460. Receive smoke
platoons from 15t, 2nd and 3rd Brigades. o/o or upon completion
of PHASE III, release 12th Chem Co and 323rd Chem Co (-) to
DIVARTY to support the Division in re-Fit and reconstitution
efforts. o/o release 181 Chem Co to 7th.Eng Bde. o/o execute
change of mission and detach from IID(M).
d. (U) Coordinating instructions.
(1) (9) PB nerve agent pretreatment IAW FRAGO
70-91, MEDICAL OPERATIONS (page N-12-5)-
(2) (S) MOPP LEVEL 2. Vehicle drivers, Engineers
on the ground during breaching operations, and other personnel
required to mount and dismount vehicles during breaching or
u of
the black chemical protective -Footwear covers-
(3) (S) Chemical casualties evacuated IAW FRAGO
70-91, MEDICAL OPERATIONS (page N-12-4).
(4) Apply M9 chemical agent detec:tor paper to
vehicles so that drivers and TCs can see it without dismounting.
Use strips 1.@ to IS inches long if possible. Apply to
overgarments IAW SOP.
(5) ES! Operators of vehicles showing positive
indication of contamination by the M9 paper (liquid
contamination) will perform operator spraydown using Mil or MIZ
DS-@@ dispensers, spraying critical areas and obviously
contaminated areas on the vehicle. Operator basic decon
procedures will be exhausted be-fore receiving histy decon
support.
(6) !S) Preferred method of decon is operator
spraydown, weathering, hasty, deliberate. Passing units and
medical vehicles have priority for hasty decon.
UN A@S@4E.D
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 4 f:/Week-27/BX001043/frago orders to opor scorpion danger dst-storm 91/nbc support during phase iii:07199611264010
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-27
Box ID = BX001043
Unit = 1ST ID
Parent Organization = VII CORPS
Folder Title = frago orders to opor scorpion danger dst-storm 91
Folder Seq # = 72
Subject = NBC SUPPORT DURING PHASE III
Document Seq # = 10
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 19-JUL-1996