Document Page: First | Prev | Next | All | Image | This Release | Search

File: 072496_jun96_decls18_0012.txt
Page: 0012
Total Pages: 38

Subject: MEMORANDUM JULLS LONG REPORT  17 MAY 91                         

Unit: 82D AB      

Parent  Organization: XVIII CORPS 

Box ID: BX001511

Folder Seq #:        311

Document Number:          3



                               UNCLASSIFIED                          05/17/91
                             JULLS LONG REPORT


          1. (U) JULLS NUMBER: 51455-71301 (00011), submitted by 307 ENS
          CWABBAA), MAJ Nelson, 239-7880, (919)432-7880.

          2. (U) Operation DESERT SHIELD/STORM conducted by CENTCOM on
          05/14/91.


          3. (U) KEYWORDS: EQUIPMENT PLATOONS

          4. (U) TITLE: Routine Affiliation of Equipment Platoons

          5. (U) OBSERVATION: Deployed brigades needed dedicated
          equipment packages to accomplish their Engineer BOB missions.

          6. (U) DISCUSSION: We always attach an equipment package to
          line platoons in support of task forces, whether it be for JRTC,
          EXEVALS, or real contingency missions. Without it, their
          ability to support the task force would be degraded. Routine
          affiliation of equipment units would improve the efficiency and
          team cohesion of the engineer "team" supporting the task force.

          . (U) LESSON LEARNED: Practice routine affiliation (habitat
          association) whenever possible.

          B. (U) RECOMMENDED ACTION: Institutionalize the practice of
          equipment platoon affiliation within the Division, as below:

          BDE     LINE CO    EQUIPMENT PLT     SPECIALTY EQUIPMENT UNIT
          IST      A/307 EN      1/618 EN          I/A&B/HHC/307 EN
          2D       B/307 EN      2/618 EN          2/A&B/HHC 307 EN
          3RD      C/307 EN      3/618 EN          3/A&B/HHC/307 EN

          The three squads from  A & Bs HHC/307th each would have 2  x D5
          Dozers, 2 x MICLIC, and 2 x Flipper mine dispensers. In
          addition, engineer support to MSC's should be dedicated as below:

                  MSC/SEP BN           ENSR SPT
                  DISCOM               1/618 EN
                  DIVARTY              2/618 EN
                  AVN BDE              3/618 EN
                  3-73RD AR            A&B/HHC/307 EN


U) COMMENTS:   N/A







          10. (U) SUBJECT: DEPLOYMENT

          11. (U) Action managed by: CALL, action worked by: I RAP number:

                                 Page 11

                               UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 38 f:/Week-22/BX001511/JULLS LONG REPORT 17 MAY 91 - 1/memorandum julls long report 17 may 91:07199610184621
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001511
Unit = 82D AB
Parent Organization = XVIII CORPS
Folder Title = JULLS LONG REPORT 17 MAY 91 - 1
Folder Seq # = 311
Subject = MEMORANDUM JULLS LONG REPORT 17 MAY 91
Document Seq # = 21
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 19-JUL-1996