Subject: DAILY COMMANDER SITREP                                          

Box  ID: BX000213

Document Number:          4

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Folder Seq #:          1

Unit: VII CORPS   

Parent Organzation: ARCENT      










          Daily SIT@@EP 7th Engineer Brigade

          211700C FEE 91


          TO: VII Corps G-3 (OPS)

          1. Daily Commander SITREP:

               a. Situation: Engineers -are now completely committed. We
          are no longer able to do good neighbor proi4ects. We are focusing
          on MSRS, UAV airfield and the breach sites. Engineers must begin
          now to support future operations and cease work vicinity TAPLINE
          road concentrating on Corps priorities.

               b. Operations/Tng. Combat battalions continue to make final
          corftbat checks Lop personnel and equipment. Engineer group effopt
          includes MSRS, survivability hospital 5uppor@l, and dust control.

               e. Combat Support Equipment Readiness               89%

               f. Personnel


                        Pers 4@-fi             % i @-i
                      Theater                  Theater              4n FAAs
                        F-il24                                         0 f@

          (@TOTE: Does not     include approximately 2000 soldiers in theater
          @'@,achad to other AASCE,.)


                    Unit Locations


                    HHC 7 ENO -RDE         NS 410680
                    HHC 109-lh EATC_L C@p  ITS 4-,C"795
                    HHC 176th ENO    GP    NT 445!75
                    HHC 926t@@ ENO   GP    Ng 23'7472
              h. Problems Requiring Corps Assistance:

                    (1) Request Botulism serum. Of 11300 doses available to
          IID, none were allocated to non-divisional engineers supporting
          the division. Request 2750 doses lor the 9th, 317th, 249th and
          588th Engineer Battalions and the 176th Group Headquarters.

                    (2) Where are the VS-17 panels that 6-4 and ACSRM said
          ARCENT is ordering? What is the Corps alternate plan if they do
          not ge@. there in            Wc- need 'Z'VOO 'V'S-'I' panel ii o

ved 10 GPS and 4
          '@L)RA@T systems 'lo date.   Every                   has         siy Peru
          including the IAD which @vas actually issued ,nore 'than their
          original authorization. Engineer units must have this capability
          to stay in @-pont ol maneuver forces- Brigade units are task
          organized do@,vri to '@-rig@de and '@ask         !Level,, yet supported
          units ,efuse to provide any o@ +-heir systems. This must be fixed
          now.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 35 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily commander sitrep:07269614225918
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY COMMANDER SITREP
Document Seq # = 18
Document Date =
Scan Date = 25-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 26-JUL-1996