Subject: 24TH MECH INF DIV OPERATION DESERT STORM AFTER ACTION REPORT
Box ID: BX001437
Document Number: 2
Folder Title: 24 MECH INF DIV AFTER ACTION REPORT
Folder Seq #: 785
Unit: 24TH ID
Parent Organzation: XVIII CORPS
UNCLASSIFIED
05/3('
J=S LONG REPORT
1. (U) JULLS NUMBER: 43066-82230 (00010), submitted by AVN BDE/2
BDE, 24 ID, 870-5516, (912)767-5516.
2. (U) Other OPN DESERT STORM NOTES conducted by 24 IN DIV (MECH)
on 03/05/91.
3. (U) KEYWORDS: ORDERS PRODUCTION, REPRODUCTION, COMAND AND
CONTROL, MAPS, COMPUTER SUPPORT, .
4. (U) TITLE: BATTLEFIELD GRAPHICS/REPRODUCTION/ADMINISTRATIVE
TECHNIQUES
5. (U) OBSERVATION: Throughout OPERATION DESERT SHIELD/STORM,
copiers and laptop computers were absolutely essential to both
the tactical and administrative / logistical operational
success. However, two major problpng exist in the deliberate
planning process: correct dissemination of accurate overlays
(graphic control measures) and the reproduction speed of the
orders and overlays.
6. (U) DISCUSSION: As the availability of laptops and copiers
declined due.to maintenance problems, unit abilities to produce
and disseminate operation orders, strip maps, overlays, etc.
also declined. The importance of these administrative assets
cannot be overemphasized. In addition, as the order is issued,
each unit adds details and control to the plan while certain
boundaries and phase lines remain constant. Like the old game
of whispering a secret around a circle of friends, by the time a
corps phase line reaches company level, it has moved several
kilometers. This problem is exascerbated when higher level
1:250,000 graphics must be transposed to a 1:50,000 scale used
at brigade and below. Further, the normal order at a battalion
or brigade headquarters is about 30-50 pages with annexes and
4-6 overlays. Under field conditions using a single feed copier
and a Diazo machine for overlays, the reproduction process
requires 6 hours.
7. (U) RECOMMENDED ACTION: All divisional units should be well
resourced with field compatible copiers and laptop computers.
Automate the orders and graphics process. Changing from
1:250,000 to 1:50,000 can be accomplished rapidly and accurately
with computers. Use burst transmissions to disseminate orders
and graphics to units. Use the technology that is available to
maintain/increase our edge in the command and control arena.
(U) SUBJECT: COMMAND & CONTROL
(U) INTEROPERABILITY: MATERIEL
(U) Lesson distributed by: 24TH IN DIV.
Page - 10
UNCLASSIFIED
Document Page: First | Prev | Next | All | Image | This Release | Search
Document 253 f:/Week-22/BX001437/24 MECH INF DIV AFTER ACTION REPORT/24th mech inf div operation desert storm after a:08029615062350
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001437
Unit = 24TH ID
Parent Organization = XVIII CORPS
Folder Title = 24 MECH INF DIV AFTER ACTION REPORT
Folder Seq # = 785
Subject = 24TH MECH INF DIV OPERATION DESERT STORM AFTER A
Document Seq # = 50
Document Date =
Scan Date = 12-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-AUG-1996