Subject: 24TH MECH INF DIV OPERATION DESERT STORM AFTER ACTION REPORT    

Box  ID: BX001437

Document Number:          2

Folder Title: 24 MECH INF DIV AFTER ACTION REPORT                                                             

Folder Seq #:        785

Unit: 24TH ID     

Parent Organzation: XVIII CORPS 






                                     UNCLASSIFIED
                                                                     05/30/91
                                   JULLS LONG REPORT

          1. (U) JULLS NUMBER: 52965-42922 (00001), submitted by G5, 24 ID,
          870-5516, (912)767-5516.

          2. (U) No type OPN DESERT STORM NOTES conducted by 24 IN DIV (MECH)
          on 05/23/91.

          3. (U) KEYWORDS: CIVIL AFFAIRS, COMMUNICATIONS.

          4. (U) TITLE: CIVIL AFFAIRS COMPANY COMMUNICATIONS

          5. (U) OBSERVATION: The reserve civil affairs company attached
          to the 24th ID (M) did not have the necessary communication
          equipment to maintain operational communication nets.

          6. (U) DISCUSSION: The reserve civil affairs company had no
          functional communication nets. The lack of communication
          capability was a threefold problem.

              a) The unit did not have all of it's TO&E communication
          equipment.

              b) Almost all of the communication equipment the unit
          arrived with was unserviceable.

              c) The unit had no secure communication capabilities.

          7. (U) LESSON LEARNED: Units without proper communication
          equipment cannot keep up with the fast pace of current
          operations. During operations in a combat zone, soldiers are
          exposed to increased danger due to an inability to receive
          command/intelligence information or request additional
          assistance through normal communication channels.

          8. (U) RECOMMENDED ACTION: Reserve units should verify
          communication capabilities at the mobilization site. This
          should include, as a minimum, verification of accountability of
          equipment, proper installation, and serviceability / capability
          of all communication equipment. Equipment shortages should be
          identified and replaced prior to deployment.



              (U) SUBJECT: OPERATIONS

 (U) INTEROPERABILITY: STRUCTURE

              (U) Lesson distributed by: 24TH IN DIV.






                                       Page - 1

                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 253 f:/Week-22/BX001437/24 MECH INF DIV AFTER ACTION REPORT/24th mech inf div operation desert storm after a:08029615062350
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001437
Unit = 24TH ID
Parent Organization = XVIII CORPS
Folder Title = 24 MECH INF DIV AFTER ACTION REPORT
Folder Seq # = 785
Subject = 24TH MECH INF DIV OPERATION DESERT STORM AFTER A
Document Seq # = 50
Document Date =
Scan Date = 12-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 02-AUG-1996