Subject: ANNEX H TO OPLAN 416 E 003 NBC                                  

Box  ID: BX000419

Document Number:         22

Folder Title: OPERATIONS PLANNING  416TH ENGINEERS OPLAN 003 JAN 91                                           

Folder Seq #:          5

Unit: ARCENT      

Parent Organzation: CENTCOM     



                                     'UNCLAS.SIFIF;.Q


         AATNEX B (NBC) TO OPLAN 416E-003

          c. Coordinating Instructions:
                     (.Z). NBC Warning System - Each subordinate element will
         coordinate with supporting ASGIASB for linkage to NBC Warning
         systems. Chemical downwind massages will be rocioved from
         supporting ASGIASB or adjacent units. ARCENT is delivering
         chemical downwind messages to ASGIASB and manuever units in
         geographical areas. This headquarters and the ASGIASB will both
         recieve any required NBC reports.

                     (2). Operational Exposure Guidance:
                          (a). Nuclear: Neg.Zible risk criteria authorized
                          (b). Chemical: Neg2igiblo risk to warned personnel
         with chemical defense equipment (CDE) is authorized; emergency risk
         to unwarned personnel without CDE is unauthorized.

                     (3). Troop Safety Criteria:
                          (a). Nuclear: Negligible risk to unwarnod, exposed
         personnel.
                          (b). Chemical: Neglibible risk to warned personnel
         with CDE.

                     (4). HOPP level guidance will be the decision of
         battalionlcompany-level commanders.

                     (5). Hasty decontamination sites will be located as far
         forward as possible to prevent the spread of contamination.

                     (6). BrigadelBattalion chemical officers will select
         primary and alternate deliberate decontamination sites in
         conjunction with FWD SPT BN reconstitution plans for contaminated
         units. A deliberate decontamination will only be accomplished as
         an exception to policy and after obtaining approval from ARCENT.

                     (7). Coordination will be made with the 416th ENCOM for
         deliberate decontamination site control,, waterlfire hydrant use,
weather
         conditions.

                     (8). Resupply of nerve agent anti-dote will be
         accomplished by coordinating with supporting medical units. This
         Is a class VXXI supply action.

                     (9). Upon request by alliedlfriendly forces, NBC defense
         equipment may be provided through security assistance channels.

         4. SERVXCE SUPPORT:
          a. Service Support: Annex C, OPLAN 416 E-003.

          b. Resupply points for class 11 decontamination supplies (BDO's.
         DS2, etc,) will be located at deliberate decontamination sites.




                                          E-3
                                                     UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 4 f:/Week-29/BX000419/OPERATIONS PLANNING 416TH ENGINEERS OPLAN 003 JAN 91/annex h to oplan 416 e 003 nbc:08169613340713
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-29
Box ID = BX000419
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = OPERATIONS PLANNING 416TH ENGINEERS OPLAN 003 JAN 91
Folder Seq # = 5
Subject = ANNEX H TO OPLAN 416 E 003 NBC
Document Seq # = 13
Document Date =
Scan Date = 25-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 16-AUG-1996