Document Page: First | Prev | Next | All | Image | This Release | Search

File: 081996_jul96_decls1_0151.txt
Page: 0151
Total Pages: 269

Subject: 3AD HISTORY OF OPERATION DESERT STORM AND SPEAR                 

Box  ID: BX001301

Document Number:          3

Folder Title: OPORDS AND  COMMAND AND CONTROL                                                                 

Folder Seq #:          4

Unit: 3D AD       

Parent Organzation: VII  CORPS  







             re                              a axpdoted   to PL  @@Sfi. a,-
             30.






                  Total.-di6taribe c"               ,@he      'A            i3
                                                                   .1il-, e4@
           :V. PHASE III                          ango                   iry 199!C)
                                .4 Saigon tg.p@m
             At 0210 on 26  February,    the Brigade LNO  arrived at the BN TOC
             with a FRAGO and new   graphics. The order was out and graphics
             readied for distribution. The Battalion would have its
             orientation changed to due     east at PL T@eri'n"e'-'@d continue
             the attack east as part of     the Br@-dade Wedge*,.  .At 0430hts the
             Battalion began                At 075@s the Battalion began
             movement and crossed pL Berlin at 0812.. At 08i4 the@Battalion
             was informed all elements would stop at PL C6..i.i-o to refuel,.
             boresight, and conduct final combat inspecti      ons. The Battalion
             moved'with 4-? CAV to the front,.4-8 *AV th the left, and 4-32AR
             (lst Brigade) to our right rear, The Battalion crossed PL Smash
             at 0910hrs, continued moving, and stopped at PL Cairo at 0950hrs.
             The Codimand.Group mof at the TOC dt 1125hrs to refine the FRAGO
             before movement. The     Battalion                  t at '114?hrs, @i
             oroseed,P@ Blacktop at 1213hrs..                    -at'1253kts., At   1156
             hrs and                        es,.ri



             a

             ac




                                                                                  Tz 2-
             t                  Om    e                   Ion             t    -4:
             a                ate advised of tanks and    howitzers. dug@im at
             along ihe' 'Brigade axis. At 1400 hrs the      Battalion was 12 kms
rine        an&-22 km!i fr"o"m e. nemy

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 269 f:/Week-28/BX001301/OPORDS AND COMMAND AND CONTROL/3ad history of operation desert storm and spear:0816961333481
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-28
Box ID = BX001301
Unit = 3D AD
Parent Organization = VII CORPS
Folder Title = OPORDS AND COMMAND AND CONTROL
Folder Seq # = 4
Subject = 3AD HISTORY OF OPERATION DESERT STORM AND SPEAR
Document Seq # = 1
Document Date =
Scan Date = 18-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 16-AUG-1996