Document Page: First | Prev | Next | All | Image | This Release | Search

File: 081996_jul96_decls1_0253.txt
Page: 0253
Total Pages: 269

Subject: 3AD HISTORY OF OPERATION DESERT STORM AND SPEAR                 

Box  ID: BX001301

Document Number:          3

Folder Title: OPORDS AND  COMMAND AND CONTROL                                                                 

Folder Seq #:          4

Unit: 3D AD       

Parent Organzation: VII  CORPS  







           Over the next week, the 6 Day fluctuated because the Division was
       placed into a "hc3lding" status on more than one occasion. During this
       time, the Corps and Division plans and graphics were finalized based on
       the Corps FRAGO 7. Nightly staff calls were used to assess the Divarty's
       combat Status and disseminate information.

           Phase III (Passage of the Iraqi obstacle system), Phase IV (Movement
       from the FAA to Objective Collins) and Phase V (Destruction of the
       Republican Guard Forces Command (RGFC)) became one Operation, and are
       covered in the -Following section.

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 269 f:/Week-28/BX001301/OPORDS AND COMMAND AND CONTROL/3ad history of operation desert storm and spear:0816961333481
Control Fields 17
File Room = jul96_declassified
File Cabinet = Week-28
Box ID = BX001301
Unit = 3D AD
Parent Organization = VII CORPS
Folder Title = OPORDS AND COMMAND AND CONTROL
Folder Seq # = 4
Subject = 3AD HISTORY OF OPERATION DESERT STORM AND SPEAR
Document Seq # = 1
Document Date =
Scan Date = 18-JUL-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 16-AUG-1996