                                     JULLS LONG REPORT


            1. -CUT JULLS NUMBER: 02625-41320 -[000041, submitted by MAJ WILSON,
            24 SIG, 24TH ID, 764-4103.

            2. -(Ul Operation DESERT SHIELD conducted by 24TH ID -(MI on 07/09/90.
            3.(@   KEYWORDS: COMMUNICATIONS, LOGISTICS, .

            4. -[U]- TITLE: AN/TTC-41A AUTOMATIC SWITCHBOARD, AIR CONDITION
            SYSTEM
            S.(@   OBSERVATION: The air conditioning system in the
            AN/TTC-41A automatic switchboards is inadequate for hot
            climates.

            6(U@ DISCUSSION: The 6,000 BTU air conditioner is mounted on
            the rear of the shelter and the coal air vented in the middle of
            the shelter along the top of the curbside viall, The areas that
            build up most heat are the backsides of the SB-3614A, especially
            the KELTECH power supply. Because the SB-3614As are installed
            In the forward right corner of the shelter, very little cool air
            reaches the back of the SB-3614A. It appears that the
            air conditioning system is designed to coal soldiers and not the
            critical equipment. We have had several KELTECH power supplies
            and SB-3614A cards -[items that are hard to getl become
            inoperative due to overheating. The signal platoon from 10th
            Mountain Division has AN/TTC-49 automatic swichboards with the
            SB-364lAs mounted center forward wall so that the cool air blows
            directly on the back of the SB-3614As. This platoon has
            experienced virtually zero overheating problems.
            7(@ LESSON LEARNED: AN/TTC-41A users need to improvise
            ducting to redirect the cool air flow to the back of the
            SB-3614As.
            8@U@ RECOMMENDED ACTION: Reconfigure the AN/TTC-41A so that
ovide a
            9,000 BTU air conditioner that Is mounted In the middle of the
            forward wall, like the AN/TTC-49, so that the cool air blows
            directly onto the back of the SB-36lAs.

            9. @Ul COMMENTS:


            --- -(Ul SUBJECT: OPERATIONS

               -CUT INTEROPERABILITY: MATERIEL

                -CUT







                                        Page - 4



                                         UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 17 f:/Week-22/BX001438/JULLS LONG REPORT/julls long report 2 nov 90:08169613342024
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-22
Box ID = BX001438
Unit = 24TH ID
Parent Organization = XVIII CORPS
Folder Title = JULLS LONG REPORT
Folder Seq # = 538
Subject = JULLS LONG REPORT 2 NOV 90
Document Seq # = 24
Document Date =
Scan Date = 04-JUN-1996
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 16-AUG-1996