Document Page: First | Prev | Next | All | Image | This Release | Search

File: 092496_jun96_decls12_0001.txt
Page: 0001
Total Pages: 1

Subject: CARC PAINTING IN TAA                                            

Unit: VII CORPS   

Parent Organization: ARCENT      

Box ID: BX000218

Folder Title: 525-2B-8 PORT OPNS FORCE MODERNIZATION                                                          

Document Number:         13

Folder SEQ  #:        158









                                           @DEPARTMENT OF THt ARM
                   Headqu
                           grtp-r
                                           @Brigade,: Ist, ln+.iuritry                           d)
                                            Poi-t Support A@'E'@vi't
                                             APO New York 09616



        AETSG-PSA
                                                                                                 @r    1990


        MEMORANDUM      FOR@@C:t)mmandoir, VII Corps         (Fc:)rward)                         9616
        SUBJECT:       CARC@@Pai:@tincl4in TAA


        1.    Based    on  cur@en@'-'A@ailability of        @CAIRC   paii                        Ltrrent
        sites, and inherent quality control constrain                                           inting
        environment, reccimmend'@Corps -FiA respon@ibili                                        and
                           pt-c-vide the +allowing capabilitie

              a. Capability for units to do p
                                                          s at paint
              b. Capability to          i5pray paint large numbers,              r       @i-.e'vehic-le-3.,
        both to paint Vlt Corps +Ieet not painted in int                      t*rip     Ez
        i?.r-eas and to SLiSt,ain painting requirements.

              Spot painting capability would require distribution                       of paint,
        paint Supplies, and respirators and other safety equipment to
        divisions in TAA. Spray paint capability would'initially require
        coordination with 593a ASG and AMC +or trans+er'of available painting
        equipment and paint once painting in part is completed.

        3. Moreover, sand c)'ai@nt may            be  available     to   be                g   a
                                                                           ,d@ ni         n      portion
oi                   a@e f ree to
        move.     64CC;@g@l!lbiis,@OM&r requirements anticipA@6d@i'6@t@e-sta'cling
        i@reas are                         rrive by ship on'.5
                                                                                                    orps
        may also          h                 additional spray painp,@hg                               9 or
        10 January@      in                ,@gaining a one to, two viiio@        h  a-tia@rlt @bef ore
        staging area sites:can;,be closed and moved.






                                                      STEPHEN D. WE
                                                      Colonel,.IN
                                                             nd ng
                                                      Comma i










                                                                              r  f

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 1 f:/Week-25/BX000218/525-2B-8 PORT OPNS FORCE MODERNIZATION/carc painting in taa:09209615582238
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-25
Box ID = BX000218
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = 525-2B-8 PORT OPNS FORCE MODERNIZATION
Folder Seq # = 158
Subject = CARC PAINTING IN TAA
Document Seq # = 38
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 20-SEP-1996