                   (d) Developed a cohesive unit by integrating soldiers
            new to 9th Chemical company with the soldiers previously
            assigned.     These teams were able to merge and work as
            independent cells in the execution of their miision.

                 (e) Deployed two teams into Kuwait. Their main mission
            was to conduct samples on order. In addition the detachment
            sent seven drivers with vehicles into Kuwait to assist F'MIB
            in the collection of captured materiels. This secondary
            mission was critical to the FMIB operation allowing them th@
            needed hauling capacity to accomplish their mission.
                     (f) The evacuation of suspected biological/chemical
            samples to' the Theater laboratories progressed smoothi
            throughout the operation, culminating in a viable an@
            working evacuation process. Several hundred samples were
            processed through the laboratories with only minimal false
            @ositives. This is in direct reflection of the efforts of
             he operators and the CRDEC liaison officers refining the
            sam@ling process in order to combat the former high d&gree
            of alse positives.
                     .(g)   Implemented a intelligence chain of reaction
            between the o erators and the intelligence sections of
            sup orted units. The information provided by the operators
            couyd then be further expedited- through- intelligence
            channels to further assist ih operational missions.
                   th(h   Due to our late arrival during operation Desert
            @torm,   e)detachment was required to be employed almost
            instantaneously. Within three days of arri;jal-, the first
            five teams werit deployed throughout-the AOR  .
                (i) communication networks were refined in order to
 the amount of logistical resupply efforts and to
            aid the teams in the dissemination of CM/BIO information to
            all levels.






















                                        III-86





                                      UNCLASSIFIED

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 7 f:/Week-33/BX000527/VOLUME 12 513TH MILITARY INTELLIGENCE BRIGADE AFTER ACTION REPORT/chronology of key events:11089615143727
Control Fields 17
File Room = aug96_declassified
File Cabinet = Week-33
Box ID = BX000527
Unit = ARCENT
Parent Organization = CENTCOM
Folder Title = VOLUME 12 513TH MILITARY INTELLIGENCE BRIGADE AFTER ACTION REPORT
Folder Seq # = 15
Subject = CHRONOLOGY OF KEY EVENTS
Document Seq # = 36
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996