Document Page: First | Prev | Next | All | Image | This Release | Search

File: 120396_jun96_decls9_0001.txt
Page: 0001
Total Pages: 41

Subject: DAILY SITREP 7TH ENGINEER BDE                                   

Unit: VII CORPS   

Parent Organization: ARCENT      

Box ID: BX000213

Folder Title: SITUATION REPORTS  7TH ENG BDE  22 DEC 90- 10 APR 91                                            

Document Number:          5

Folder SEQ  #:          1











           Daily S'L@REP 7th Engineer Brigade


           31'@422C JAN 91
           TO: VI@I Co-Ps G-3 (0@s')

                a. Situation. Brigade provides survivability support 'lo Is@,
           Cav D'@v. Construction continues         jyj Tog  Base 'c@



                b. Operations/Tng. Construo'@i-on:

                            T@g Base Echo,

                            (a) Access Foad--gg%


                            (b) CL V 95%

                     (2)

                e. Combat Support Equipment         Readi-nesv

                     Personnel


                          Perg in             % in
                       Theater               Theater              TAA
                          C,, 28               7P,i'            5-@-nz

                g.   Unit Locations:

                     HuC I EI@TG BDE         PS 439144
                     H@-@-        EVG GP     PS 439144
                     HHC 176@lh Ei%Trll GP   NO, 560P--U'@u
                     HIIC 926@uh E\TG  GP    hTS 559612


                     Problems Requiring Corps Assistance:

                      1     -Li -r, x, c- xi tdistribution o@ position locators will
           provide   'this  -D-@i8-ade  -.h z-, I -@ac @, i -i o -F i ts, r, a @,7u,.' i,
           the a assets,    we will, be               Di-,ov'.de



                            Brigade  needs 4n Lise 'he exlg"-@2,g               quantity
           of crushed Pool, at quarr,@es by '@o        !Has-c Echo         Contract
           deliveries are '@o'ualiy i-risu4i-c-@'ent to support construction of
           MSRs7 2,uriways, and forward stockpiles @ r future operations.

                     (3)    Lack of a map denot i-n sector             continue to
           hinder distribution to MSCS. Existing location near port cannot
           be responsive to division and other unit requirements and recent
           bad weather underscores need for cover, Hundreds of pallets o@
ements.                 A
           fest tent or similar -structure wi-11 suffice-

Document Page: First | Prev | Next | All | Image | This Release | Search


Document 41 f:/Week-24/BX000213/SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91/daily sitrep 7th engineer bde:11089615143325
Control Fields 17
File Room = jun96_declassified
File Cabinet = Week-24
Box ID = BX000213
Unit = VII CORPS
Parent Organization = ARCENT
Folder Title = SITUATION REPORTS 7TH ENG BDE 22 DEC 90- 10 APR 91
Folder Seq # = 1
Subject = DAILY SITREP 7TH ENGINEER BDE
Document Seq # = 5
Document Date =
Scan Date =
Queued for Declassification = 01-JAN-1980
Short Term Referral = 01-JAN-1980
Long Term Referral = 01-JAN-1980
Permanent Referral = 01-JAN-1980
Non-Health Related Document = 01-JAN-1980
Declassified = 08-NOV-1996